Download presentation
Presentation is loading. Please wait.
1
2016-12-06 Max Riegel, Nokia (TG Chair)
IEEE OmniRAN TG Conference call on 5G SC Action A (Industry Connections activity) Max Riegel, Nokia (TG Chair)
2
Guidelines for IEEE-SA Meetings
All IEEE-SA standards meetings shall be conducted in compliance with all applicable laws, including antitrust and competition laws. Don’t discuss the interpretation, validity, or essentiality of patents/patent claims. Don’t discuss specific license rates, terms, or conditions. Relative costs, including licensing costs of essential patent claims, of different technical approaches may be discussed in standards development meetings. Technical considerations remain primary focus Don’t discuss or engage in the fixing of product prices, allocation of customers, or division of sales markets. Don’t discuss the status or substance of ongoing or threatened litigation. Don’t be silent if inappropriate topics are discussed… do formally object. If you have questions, contact the IEEE-SA Standards Board Patent Committee Administrator at or visit See IEEE-SA Standards Board Operations Manual, clause and “Promoting Competition and Innovation: What You Need to Know about the IEEE Standards Association's Antitrust and Competition Policy” for more details. This slide set is available at March 2015 IEEE-SA Standards Board Patent Committee
3
Agenda Introduction IEEE SA Industry Connections Industry Connections Activity Initiation Document (ICAID) Plan for Jan ’17 Atlanta meeting AoB
4
Motion at 802.1 Nov ’16 closing plenary
Authorize OmniRAN TG to create an ICAID proposal addressing the 5G SC Action A and authorize the chair to pre-circulate the ICAID proposal to the EC for consideration. Moved: Max Riegel Second: John Messenger Vote: 22, 0, 1
5
5G SC Action A
6
Action A: IEEE “5G” specification Candidate Approach
6 Mentor DCN: EC GSG 11/8/2018 Action A: IEEE “5G” specification Candidate Approach • specify an 802 access network could be based on P802.1CF “network reference model defines a generic foundation for the description of IEEE 802 access networks, which may include multiple network interfaces, multiple network access technologies, and multiple network subscriptions, aimed at unifying the support of different interface technologies, enabling shared network control and use of software-defined networking (SDN) principles” provides an external view into general 802 access network could support many 802 MACs and PHYs could plug into incumbent mobile operator networks for example, expand the notion of LWA so that the cellular network supports 802 rather than gives 802 a strong supporting role in cellular 5G networks could support integration into other operator networks e.g. cable TV or fixed telecom gives 802 a central role in non-cellular 5G networks feasible for 802 access network to support both need not promote it as an “IEEE 5G” network
7
7 Mentor DCN: EC GSG 11/8/2018 IMT-2020 (per ITU-R M.2083)
8
Could be called ‘IEEE ngci’
Scope of Action A “IEEE next generation communication infrastructure specifications that support enhanced broadband, massive machine type communication and ultra-reliable and low latency communications not belonging to mobile networks” Could be called ‘IEEE ngci’ For further study
9
Who could be the ‘customers’?
Other operators of public communication networks than mobile network operators MSO FNO Hotspot operators ‘Verticals’ represented in IEEE standards like Smart Grid Cloud Computing Internet of Things (including Green Community Networks) Intelligent Transportation Systems eHealth Smart Cities
10
What would we like to achieve?
Strengthen the IEEE 802 ecosystem by unifying technical approaches among various deployment domains. More direct involvement of customers in the evolution of IEEE 802 technologies Faster adoption of emerging trends into IEEE 802 standards by better understanding of market evolution Already complete listing? At least, no other proposal raised in call.
11
Who are the leading customers?
What do we miss? What are the requirements and commonalities among the various deployment domains of IEEE 802 technologies? Who are the leading customers? No other issue mentioned in the call.
12
IEEE SA Industry Connections
13
IEEE SA Industry Connections activity
Aimed for technical group discussions (far) ahead of starting PAR discussions. ICAID (Industry Connections Activity Initiation Document) request form for approval Presentation by John: Use of Industry Connections in IEEE 802 Further resources:
14
DRAFt ICAID
15
Revision with comments from John:
Draft ICAID Initial draft text based on input from John and edited by Max available by Revision with comments from John:
16
Way forward
17
Next steps Chair invites for comments on draft ICAID for the upcoming meeting at the IEEE 802 interim. Text of ICAID will be revised at the meeting based on submitted comments. Next F2F meeting: Atlanta, Jan 2017 Session on Wed, January 18th, PM2 Next conference call: Tues, January 31st, 2017, 09:30-11:00AM ET BTW: Submission deadline of ICAID for consideration in the March EC closing: February 10th
18
Next steps & AoB Could we start discussing the ICAID on the mailing list? Response of the chair: Discussion on the mailing list is challenging, as there is no dedicated mailing list for the preparation of the ICAID. We use various mailing lists, like the list, the AANI list, and the IEEE 802 5G list. Therefore the continuation of the discussion is aimed for the Atlanta meeting. AoB None Chair adjourned call at 11:00 AM ET.
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.