Transmission for Renewables- The New England Blueprint and Interconnection-Wide Planning
Paul J. Hibbard, Chairman Massachusetts Department of Public Utilities Roundtable March 2010
2
Overview New England Blueprint Eastern Interconnect Planning
Quick reminder Current status Eastern Interconnect Planning JCSP, EWITS, EIPC/EISPC Modeling approaches Observations Potential Role in the Federal Context
3
The Blueprint’s Path September 2008 February 2009 March 2009 July 2009
NEGC Resolution February 2009 Governors write to President Obama, Congressional leaders March 2009 States request ISO-NE perform technical analysis July 2009 ISO-NE issues draft Renewable Development Scenario Analysis September 2009 NEGC Adopts Blueprint
4
Policy Choices Informed By Data
States asked ISO-NE to study “significant sources of renewable energy available to New England, the most effective means to integrate them into our power grid, and the estimated costs” and then developed study assumptions ISO-NE conducted RDSA Looks out 20 years 9 conceptual transmission scenarios Focus on wind resources Up to 12,000 MW of wind in New England 7,500 MW onshore & 4,500 MW offshore Incremental cases from 2,000 to 8,000 MW
5
Conclusions The New England region has a vast quantity of untapped renewable resources More than 10,000 MW (nameplate) on & off-shore wind power potential If developed at conservative levels, there are ample renewable resources to enable New England to meet renewable energy goals More aggressive development could enable New England to export renewable power to neighboring regions
6
New England Governors’ and NEG/ECP Resolutions
7
Charge to Energy Officials
Consider available renewable resources identified in the Blueprint New England onshore New England offshore Canada Investigate mechanisms for competitive procurement and development Coordinated or joint solicitations Coordinated/collaborative siting Workable contract and pricing structures Regulatory approval mechanisms
8
Status, Timeline Initial policy review Current efforts Vast resources
Siting processes similar; coordination feasible Contract approval mechanisms in place Common theme: competitive procurement, lowest possible cost Current efforts Workplan – report to Governors by summer Drafting RFP, considering procurement levels Developing price structure alternatives, model terms and conditions Deeper review: contract approval processes
9
Bottom Line Region has a long history of working cooperatively to address energy and environmental policy issues Recognize untapped renewable potential Interested in “out-of-box” thinking on supporting renewable development …without compromising commitment to markets, competition Successful progress, promising outlook
10
The Federal Context Urgency around climate change
Problem: much of national terrestrial renewable potential is geographically-challenged Concern: financial signals from cap/trade, RES not sufficient for investment calculus Other issues/opportunities: Integration of intermittent resources Better capacity utilization Seams elimination; loop flows; congestion relief Jobs, economic benefit Can widescale, coordinated planning help? JCSP, EWITS, EIPC/EISPC
11
EWITS Emerged from JCSP; model for EIPC? Northeast has some concerns
Goal: review technical integration of large amounts of wind Review costs, quantify benefits But weight of analysis seems more focused on economic integration of wholesale electricity markets across the Eastern Interconnect Confusion in the messaging?
12
EWITS: NESCOE Comments
Model Approach – focused more on transmission for all generation in Midwest, rather than integrating wind. Coal By Wire: Transmission expansion likely to increase generation from Midwest traditional sources, undermining the goals of carbon control Messaging In The National Context – Framed to suggest transmission should be charged to electricity customers, rather than generation owners that benefit Production Profits Charged to East, Accrue to Midwest – All scenarios likely result in massive increases in generation from (and associated revenues to) power plants in the Midwest, relative to now Limits Off-Shore Wind Potential – No more than six (6) miles off shore; no deep water wind resources Canadian Provinces Neglected – Minimal expansion of Canadian resources Feasibility and Cost of Underlying Network? – Scenarios could require significant in-region infrastructure
13
EWITS Steps in analysis Existing system, load grown to 2024
Pick “best” wind resources to meet 6%, 20%, 30% goals, with some regional allocation, ascribed 20% capacity value EGEAS-based capacity addition for remaining needs “Copper Sheet” dispatch of EI; determine economic power flows Design transmission to accommodate this “economic” result (Even in the “Reference Case”) Identify economic benefits by comparing to constrained dispatch Identify wind integration issues (reserves)
14
EWITS - Conclusions Basic results:
We can integrate a lot of wind… Provided we build massive transmission… Which will deliver economic benefits to consumers by lowering LMPs… Because it will move massive amounts of energy from Midwest fossil, nuclear, etc. generation to the East, displacing gas. But wait! Wasn’t this supposed to be about wind??
15
EWITS - Conclusions Economic benefits (PROMOD IV)
Driven by price differential between midwest and eastern power markets Increases in midwest generation, decreases in eastern gas (hundreds of TWh annually) Lost generation revenues in East; gains in the Midwest Net revenues to Midwest generation likely to exceed transmission cost Does this help answer the cost allocation debate?
16
JCSP/EWITS: Price Separation…
JCSP, April, 2007
17
JCSP/EWITS: …Drives Power Flow Outcomes
JCSP, April, 2007
18
JCSP: Resulting Shift in Generation
JCSP, April, 2007
19
EWITS: Same Result… EWITS Report
20
Dictates Transmission
EWITS Report
21
EIPC/EISPC Long Overdue
Interregional transmission plan coordination; greater cooperation across planning authorities Review seams, loop flow issues, identify technical fixes Consider projects to help integrate greater quantities of intermittent resources Identify interregional projects to address intraregional reliability issues Help quantify cost of policy approaches Provide “scenario analysis” guidance for policy makers and stakeholders Value of EE, renewables, nuclear, CCS Info for development ventures
22
EIPC/EISPC: Caution Emerging context: Federal integrated resource planning, federal siting, mandated cost allocation to load Senate legislation: Begins with an Interconnect-wide plan EIPC/EISPC meets the specs Could this “scenario analysis” exercise turn into a federally-endorsed plan? Need to get the analysis right Real base case, in same year as “scenarios” Clear identification of purpose (carbon? renewables? reliability? economic transfer?) States must have primary role in guiding and interpreting analysis EIPC analysis must be closely coordinated with EISPC State share of EIPC stakeholder group
23
Wrap Up Blueprint represents a unique collaboration among the New England states; focused on competitive mechanisms to deliver renewables; progress continuing Federal context: similar goals in principle New England experience with joint state-ISO Blueprint development is an excellent model for federal effort EIPC can provide great value to the nation, provided Goals are clear at the outset Modeling is suited to the task, answers right questions States provide guidance commensurate with public interest role
24