Download presentation
Presentation is loading. Please wait.
1
1th meeting Mar del Plata, Argentina 24-26 October 2012
WOC3 -TRANSMISSION Welcoming Words - Benjamín Guzman- Chairman of WOC3 1th meeting Mar del Plata, Argentina 24-26 October 2012
2
COORDINATION COMMITTEE CHAIRMAN
Committee Structure COORDINATION COMMITTEE CHAIRMAN VICE CHAIRMAN SECRETARY WOC 3 Transmission WOC 4 Distribution WOC 5 Gas use GAS CHAIN WOC 1 E&P WOC 2 Storage PGC A Sustainability PGC B Strategy PGC C Gas Markets PGC D LNG PGC F R D & I PGC E Marketing & Com TF1 Human Capital TF2 Gas Advocacy TF3 Geopolitics
3
IGU Committee and TF Chairs
Vice CHAIRS WOC 1 BRAZIL DENIS DINELLI WOC 2 SLOVAKIA LADISLAV GORYL WOC 3 ARGENTINA BENJAMIN GUZMAN WOC 4 GERMANY DIETMAR SPOHN WOC 5 RUSSIA EUGENE PRONIN PGC A JAPAN SATHOSHI YOSHIDA PGC B ALGERIA FETHI ARABI PGC C KOREA GI CHUL JUNG PGC D THE NETHERLANDS DIRK VAN SLOOTEN PGC E SPAIN ALFREDO INGELMO* PGC F USA JACK LEWNARD TF 1 HUMAN CAPITAL AGNES GRIMONT TF 2 GAS ADVOCACY MICHELE PIZZOLATO TF 3 GEOPOLITICS GEERT GREVING
4
2012 – 2015 Key Authorities
5
Structure / WOC 3 Study Group 3.1 Study Group 3.2 Study Group 3.3
NEW TRANSMISSION PROJECTS Study Group 3.2 INTEGRITY MANAGEMENT SYSTEMS Study Group 3.3 PUBLIC ACCEPTANCE & NEW TECHNOLOGIES To enunciate the approach of the Asset Management Systems. To inform new developments to reduce gaps that exist in terms of integrity threats. To propose strategies to prolong the life of ageing pipes or to reclassify the ones in use. To describe what Governments (with the applications of new rules), companies and suppliers are doing to improve “Third party damage prevention”. To identify critical tasks that affect the integrity management Provide appropriate training to personnel who perform qualified tasks This Study Group will take over the work done by the Current SG 3.3 to build on it strategies that support the HR topic of an effective IMS. Moreover, this Study Group will be responsible for building and maintaining a DATABASE OF THE TRANSMISSION SYSTEMS . PUBLIC ACCEPTANCE: To ensure effective communication with the public. To show that the most convenient means of energy transportation is by pipelines. To report on different actions that the companies are taking for environmental footprint reduction. THE IMPACT OF THE NEW SOURCES ON TRANSMISSION SYSTEMS: To summarize the new gas sources in the world. To analyze and present possible topics like: cross country tolls, long haul tariffs, environmental regulations, regulations for open access with free flow of gas and hubs. NEW TECHNOLOGIES APPLIED TO TRANSMISSION SYSTEMS To discuss new pipe materials To propose alternative uses of the pipeline (e.g. CO2). To report strategic transmission infrastructure projects To deal with the problem of acceptance of technology and technical constructions. To study the feasibility of new pipelines with small distances to areas of densely populated areas. To study improvements in the compression process, turbo machineries, performance optimization, emissions. 5
6
WOC 3 : Transmission 1/3 Study Group 3.1 (SG3.1) : NEW TRANSMISSION PROJECTS Scope and Purpose Every new transport project is complex and unique because of special characteristics. In some cases, the new project involves laying high pressure gas pipelines along very long distances, across difficult land, densely populated areas. Some projects have a combination of these difficulties. The purpose of this group is to gather information on new projects related to gas transport (pipeline and compressor plants), to analyze the solution used in each case and propose the best construction practices that can be applied by the industry in the future. TRANSMISSION INFRASTRUCTURE: To report strategic transmission infrastructure projects To deal with the problem of acceptance of technology and technical constructions. To study the feasibility of new pipelines with small distances to areas of densely populated areas. To study improvements in the compression process, turbo machineries, performance optimization, emissions.
7
WOC 3 : Transmission 2/3 Study Group 3.2 (SG3.2) : INTEGRITY MANAGEMENT SYSTEMS Scope and Purpose It is necessary to enhance the Integrity Plans in order to reduce risk of failure and accidents based on the Asset Management Systems approach. INTEGRITY: To enunciate the approach of the Asset Management Systems. To inform new developments to reduce gaps that exist in terms of integrity threats. To propose strategies to prolong the life of ageing pipes or to reclassify the ones in use. To describe what Governments (with the applications of new rules), companies and suppliers are doing to improve “Third party damage prevention”. To identify critical tasks that affect the integrity management Provide appropriate training to personnel who perform qualified tasks This Study Group will take over the work done by the Current SG 3.3 to build on it strategies that support the HR topic of an effective IMS. Moreover, this Study Group will be responsible for building and maintaining a DATABASE OF THE TRANSMISSION SYSTEMS of all IGU Member, containing relevant information about transmission network (physical data, performance, projects, new rules, etc)
8
WOC 3 : Transmission 3/3 Study Group 3.3 (SG3.3) : PUBLIC ACCEPTANCE and NEW TECHNOLOGIES Scope and Purpose It is convenient to create the best public acceptance of the gas transmission systems for that reason this study group will analyze the growth of the gas industry in two key aspects of the production chain. On the one hand the legal requirements that the provision of new gas supply sources (shale and other indigenous sources of gas) requires, such as: environmental, economic and other aspects. On the other hand new technologies applied to the gas industry to transport larger quantities of gas, and its components, in a safe and reliable way. PUBLIC ACCEPTANCE: To ensure effective communication with the public. To show that the most convenient means of energy transportation is by pipelines. To report on different actions that the companies are taking for environmental footprint reduction. THE IMPACT OF THE NEW SOURCES ON TRANSMISSION SYSTEMS: To summarize the new gas sources in the world. To analyze and present possible topics like: cross country tolls, long haul tariffs, environmental regulations, regulations for open access with free flow of gas and hubs. NEW TECHNOLOGIES APPLIED TO TRANSMISSION SYSTEMS To discuss new pipe materials To propose alternative uses of the pipeline (e.g. CO2).
9
Membership / WOC 3 Total nominated members : 93
Attendees on the 1st Meeting : 33 We invite everybody to join a Study Group. If you have not chosen a SG to work yet, feel free to join any group
10
Confirmed WOC3 Members per country
Total nominated members : 93 participants from 37 Countries ALGERIA (4) ARGENTINA (3) AUSTRALIA (5) BELGIUM (1) BOSNIA AND HERZEGOVINA (3) BRAZIL (4) CROATIA (3) CZECH (1) DENMARK (4) FINLAND (5) FRANCE (7) GERMANY (1) HONG KONG (1) IRAN (3) ITALY(2) JAPAN (3) KOREA (2) MALAYSIA (1) NORWAY (1) PERU (1) POLAND (4) PORTUGAL (1) RUSSIA (6) SERBIA (2) SLOVAKIA (6) SLOVENIA (1) SWEDEN (1) SWITZERLAND (2) THAILAND (1) THE NETHERLANDS (1) TUNISIA (2) UK (1) USA (2) EGYPT (1) PAKISTAN (3) SPAIN (2) VENEZUELA (2)
11
Participants WOC3 Meeting per country
Total nominated members : 33 participants from 20 Countries ARGENTINA (2) AUSTRALIA (1) ALGERIA (2) TUNISIA (2) USA (1) UK (1) SLOVAKIA (2) RUSSIA (5) POLAND (2) NORWAY(1) MALAYSIA (1) KOREA (2) JAPAN (2) BRAZIL (2) ITALY (1) GERMANY (1) FRANCE (1) FINLAND (1) DENMARK (2) CZECH(1) VENEZUELA (2)
12
Apologies for absence Last minute cancelation received from:
KRAJISNIK Slavo SILVEIRA Cynthia LARSEN Torben KORPELA Arto CROCOMBETTE François AKEL Samir DOYHAMBOURE Gilles BATTILANA NICOLA AIZU Kenji HELLSTROM ANDERS TAPANEEYAPAN Noranut BOLT Rein SINGH Sunmeet
13
We have had 3 Conference Calls with Leaders, Deputies and Sponsors.
First Steps / WOC 3 Photo from the exploratory (start) meeting in KL, June 2012 We have had 3 Conference Calls with Leaders, Deputies and Sponsors.
14
Meetings schedules / WOC 3
Dates and locations of the 6 meetings Meeting Exploratory 1 2 3 4 5 6 Date 8 June 2012 24 – 26 October 2012 March 2013 September February 2014 2015 Venue KL IGU WGC Mar del Plata Argentina To be confirmed Italy Czech Republic Algeria To be decided Main objectives of the meeting (start) meeting Discussion with SG leaders about scope and time schedule 1st progress report from SG’s and 1st draft table of content final WGC report 2nd progress report from SG’s and 2nd draft table of content final WGC report Preparation 26th WGC 3rd progress report from SG’s and approved table of content final WGC report 4th progress report from SG’s and draft final WGC report Preparation 26h WGC 5th progress report from SG’s and final WGC report
15
Authorities / WOC 3 WOC 3 SG 3.1 : « NEW TRANSPORTATION PROJECTS »
Chairman: GUZMAN Benjamín Vice – chairman: JAROSLAV Petros Secretary: FALABELLA Daniel WOC 3 SG 3.1 : « NEW TRANSPORTATION PROJECTS » Leader : TOTH Peter, Slovakia Deputy: Will be decided at the 1st meeting WOC 3 SG 3.2 : « INTEGRITY MANAGEMENTS SYSTEMS » Leader : TABERKOKT Abderrahmane, Algeria Deputy: NAZMI Mohd, Malaysia WOC 3 SG 3.3 : « PUBLIC ACCEPTANCE and NEW TECHNOLOGIES » Leader : MORETTI Alessandro, Italy Deputy: FAJARDO Hector, USA
16
Introduction of members / WOC 3
Name Company Experience Background in WOC3
17
Agenda 24th October 25th October 26th October
9:00 – 10:30 Plenary Meeting 10:45 – 12:30 Study Group meetings 12:30 – 14:30 Buffet Lunch 14:30 – 18:00 Study Group meetings 20:00 Openning Dinner 25th October 9:00 – 10:30 Study Group meetings 10:45 – 12:30 Plenary Meeting 14:30 – 18:00 Plenary Meeting 20:00 Eveing Programme (Tio Curzio restaurant) 26th October 9:00 – 10:45 Technical meeting 10:45 – 17:00 Lunch at an Argentine Country Estate
18
Agenda
19
Agenda
20
Agenda
21
Agenda
22
Agenda
23
Thank you for your attention
24
Round Table News of the gas industry around the world
WOC3 members are requested to prepare a short oral presentation (2-3 minutes) about recent developments in the gas industry in their country. Subjects might be: changes in the gas market, changes in the companies, major infrastructure projects, safety & environmental issues etc. Algeria Malaysia Norway Australia Poland Rusia Brazil Slovakia Tunisia Czech Republic UK USA Denmark Venezuela 24
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.