Demolition 29 CFR 1926, Subpart T

Similar presentations


Presentation on theme: "Demolition 29 CFR 1926, Subpart T"— Presentation transcript:

1 Demolition 29 CFR 1926, Subpart T

2 Overview of the OSHA regulation
Preparations Pre-job survey By competent person Determine structural integrity Have evidence in writing 1a

3 Overview of the OSHA regulation
Preparations All utilities shut off Needed utilities relocated to temporary hook-up Identify hazards & guard (glass) Cover all floor openings not to be used 1a

4 Stairs, Passageways, & Ladders
Close those not to be used Maintain only those for access Proper illumination needed 2a

5 Chutes No dropping of materials outside the building w/o protection (chute) Totally enclose chutes 45 degrees & greater End of chute guarded 2b

6 Masonry Removal Do not overload floors with materials from other floors or components Totally enclose chutes 45 degrees & greater Safe access to scaffolds & walkways required 2b

7 Floor Removal Provide adequate work surfaces for employees
Minimum 2X10 (undressed) planks Openings less than 16” 3a

8 Using Equipment for Removal
Check structure’s ability to support load Provide curbs to prevent driving over edge Meet all aspects of Subparts N & O 3b

9 Storage Debris on floors must not exceed allowable floor loads 3c

10 Mechanical Demolition
Keep employees out of work area Remove heavy building attachments prior to demo Cut steel prior to pulling over Competent person must oversee job 3d