ABC PE 4 Provides most information for utilities cost—buildings
1. What is the best cost driver for overhead cost related to the utilities portion? a. Number of buildings b. Number of vehicles c. Number of square footage of each building Provides most information for utilities cost—buildings can be different sizes 2. Which of the following are the cost objects for allocating overhead costs? a. Units b. Vehicles c. Buildings Cost Object = The product, service, or object that created the costs
2
= $327,678 is the cost for Company A = $42.01 per Sq Ft
3. What is the allocation rate assuming all costs are allocated based on building square footage? a. $63.76 per square foot b. $6.48 per square foot c. $42.01 per square foot Step 1- first find all costs Building Maintenance costs- $350,000 for labor and $65,000 for materials and equipment. = $350,000 + $65,000= $415,000 Grounds upkeep- $100,000 for labor, $30,000 for equipment maintenance and $50,000 for supplies. =$100,000 +$30,000 + $50,000= $180,000 4. Using the rate that you found in question 3, how much would the cost be for Unit B? a. $256,261 b. $327,678 c. $231,055 Utility costs= $220,000 Total costs = =$815,000 Step 2- find total square feet for all the buildings Unit A = 6,100 Total Sq Ft Unit B = 7,800 total sq ft Unit C = 5,500 Total Sq Ft Total Square feet = = 19,400 Total Sq Ft Step 3- Allocation rate (slide 21 from class) Step 4- Unit B has 7,800 SQ FT = Total Cost pool / Total # Driver Units The allocation rate is $42.01 per Sq ft = Total Costs / Total Sq Ft =7,800 SQ Ft * $42.01 per Sq ft= = $815,000 / 19,400 Total Sq Ft = $327,678 is the cost for Company A = $42.01 per Sq Ft
3
=$169,765 close enough (rounding)
5. What is the amount of the total overhead cost for Unit B assuming all cost are allocated based on using the number of buildings? a. $305,622 b. $169,790 c. $339,580 Step 1- first find all costs (Cost Pool) Building Maintenance costs- $350,000 for labor and $65,000 for materials and equipment. = $350,000 + $65,000= $415,000 Grounds upkeep- $100,000 for labor, $30,000 for equipment maintenance and $50,000 for supplies. =$100,000 +$30,000 + $50,000= $180,000 Utility costs= $220,000 Total costs = =$815,000 Step 2- find the total number of buildings (Driver units) Unit A bldgs Unit B bldgs Unit C bldgs Total Number of Buildings = = 24 bldgs Step 3- Allocation rate = (slide 21 from class) Total Cost pool / Total # Driver Units Step 3 alternate solution (proportion method) – (slide 21 from class) Total Costs / Total number of bldgs Proportion method = = $815,000 / 24 bldgs = # of Driver units used / total # of driver units = $33,958 per bldg. = 5 bldgs / 24 bldgs =0.2083= Proportion rate for Unit B Unit B = 5 bldgs = $33,958 per bldg. * 5 bldgs = $169,790 = * Total cost = * $815,000 =$169,765 close enough (rounding)