Download presentation
Presentation is loading. Please wait.
1
Leave Processing Timeline
Start Date -35 Start Date -30 Start Date -25 Start Date Thru Date Thru Date +72 hrs SM submits leave form to the Unit Operations Depending on the hour of the day, SM will sign out on the DA 647 Personnel Register with either BN S1 ( ) or BN Staff Duty SM will sign back in on DA 647 (ordinary leave only) DA 31 will be submitted to finance NLT than 72 hours Company submits DA 31 to BN S1 BN S1 Reviews leave form, issues a control number & documents in the leave control log Unit Commander reviews and signs leave form BN S1/SDNCO will fill in blocks 16a,b,c with the date, time and approval authority signature of DA 31 upon return BN S1/ SDNCO will annotate the date, time and approval signature in blocks 14a,b,c of the DA 31 BN S1 distributes finalized DA 31 to Unit and SM via BN S1/ SDNCO make a copy of leave form if requested
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.