Download presentation
Presentation is loading. Please wait.
1
DLA Aviation PQDR Process
May 15, 2018 FOR OFFICIAL USE ONLY
2
DLA Aviation PQDR Process
DLA Aviation Product Quality Deficiency Report (PQDR) Allen Gibbs Contract Administrator Post Award PQDR Monitor Special Projects Officer Industry Day May 15, 2018 FOR OFFICIAL USE ONLY
3
DLA Aviation PQDR Process
The PQDR…. is the primary tool used for receiving feedback from material users on the state of systems and equipment issued through the supply system. The primary purposes of a PQDR: Report non-conformances Provide a vehicle to recover material cost Initiate steps to effect corrective and preventative actions FOR OFFICIAL USE ONLY
4
DLA Aviation PQDR Process
Items which may qualify for a PQDR … Any defect, nonconforming condition, or premature equipment failure indicating deficiencies in design, specification, material, manufacturing, and workmanship Deficiencies in major weapon systems, secondary/consumable/repairable items, spare and repair parts, and Government-furnished property “Material does not meet form, fit, or function FOR OFFICIAL USE ONLY
5
DLA Aviation PQDR Process
Discrepancies NOT qualifying as a PQDR … Failure because of improper/inadequate maintenance or operation Failure with normal use within reasonable range of life expectancy Receipt of incorrect material or non-receipt, shortages/overages, and discrepancies in preservation, packing, or marking (SDR applies) Transportation discrepancies
6
DLA Aviation PQDR Process
FAR, DFARS, DLAD: DAAWG G1 DFARS Nonconforming supplies or services. If nonconforming material or services are discovered after acceptance, the defect appears to be the fault of the contractor, any warranty has expired, and there are no other contractual remedies, the contracting officer— Shall notify the contractor in writing of the nonconforming material or service; Shall request that the contractor repair or replace the material, or perform the service, at no cost to the Government; and May accept consideration if offered. For guidance on solicitation of a refund, see Subpart
7
DLA Aviation PQDR Process
PQDR Notification Documents For each PQDR the Contractor may receive all of the following documents: Pre-Investigation Letter Investigation Letter Post Investigation Letter Unilateral Contract Modifications for the PQDR Exhibits Bilateral Contract Modifications for Stock Screen/Restitution Modifications for Stop Work Order All PQDR Letters will contain suspense dates
8
DLA Aviation PQDR Process
For PQDR inquiries: Allen Gibbs Post Award PQDR Monitor
9
DLA Aviation PQDR Process
Questions?
10
FOR OFFICIAL USE ONLY
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.