Download presentation
Presentation is loading. Please wait.
Published byBrice Gallagher Modified over 6 years ago
1
South San Gabriel Boulevard Pacific Square SG Scoping Meeting Case Planner: Tracy Steinkruger, Planning Manager
2
Agenda for Tonight Introduce City staff Introduce Developer team
Introduce Environmental Review Environmental Science Associates (ESA) Fehr & Peers Project Description (Tracy ) Environmental Review Process / Scoping Meeting (Addie)
3
Project Site 700-800 S. San Gabriel Boulevard 5.85-acre site
Grand Avenue (South) S. San Gabriel Blvd. (West) Gladys Avenue (East) El Monte Boulevard (North) 5.85-acre site Previously occupied by the San Gabriel Nursery & Florist They continue to operate just north of the project as a retail garden and florist shop Site is currently vacant with no existing structures.
4
Project Description Mixed-use development 700 Plaza 800 Plaza
Two major “plazas” – “700 Plaza” and “800 Plaza” 700 Plaza 102 residential condominium units 38,383 SF of commercial space (restaurant, retail, fitness center) 800 Plaza 141 residential condominium units 41,604 SF of commercial space (restaurant, retail, grocery store) Project Summary 243 residential units (413, 238 SF) 79,987 SF of commercial uses
5
Project Description
6
Project Description
7
Project Description
8
Project Description
9
Scoping Meeting Objectives
Provide information about the Pacific Square San Gabriel Mixed Use Project Provide information on Environmental Impact Report (EIR) process and timeline Identify environmental issues for analysis in the EIR Solicit community input regarding environmental issues of concern to be analyzed in the EIR Determine scope and content of the EIR * The intent of the Scoping Meeting is to receive information that helps determine the scope and content of the EIR. The City is at the beginning of the environmental review process and has not yet analyzed all of the potential impacts of the project.
10
The EIR Process Prepare/Distribute Notice of Preparation
(30-day review ends September 28, 2018) Prepare Final EIR Including Response to Comments Public Scoping Meeting September 19, 2018 Public Hearings Prepare Draft EIR File Notice of Determination Public & Agency Review of Draft EIR = Opportunities for Public Input = We are here in the process
11
Environmental Impact Report
Summary Introductory Discussion Project Description Impact Analysis Cumulative Impacts Alternatives to the Project Mitigation
12
Environmental Impact Report
The EIR will focus on the environmental areas where impacts are most likely to occur: Aesthetics Air Quality Biological Resources Cultural Resources Geology and Soils Greenhouse Gas Emissions Hazards and Hazardous Materials Hydrology and Water Quality Land Use Noise Population and Housing Public Services Transportation and Traffic Tribal Cultural Resources Utilities and Service Systems
13
Submittal of Public Comments
Scoping Period Comment Period August 29, 2018 to September 28, 2018 All comments must be submitted in writing via or regular mail to: City of San Gabriel Community Development Department – Planning Division 425 S. Mission Drive San Gabriel, CA 91776 Attention: Tracy Steinkruger, Planning Manager
14
South San Gabriel Boulevard Pacific Square SG Scoping Meeting Case Planner: Tracy Steinkruger, Planning Manager
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.