Electric Power Generation
ECE 4501 Electric Power Generation
2
BOSWELL ENERGY CTR Minnesota Power’s Primay Generation Ceneter (an Allete Company!) Unit 1, 70 megawatts, operational in Unit 2, 70 megawatts, operational in Unit 3, 350 megawatts, operational in Unit 4, 535 megawatts, operational in 1980.
3
Boswell from the Air
4
Power Station
5
Boiler
6
Steam Turbine/Generator
7
Turbine
8
Synchronous Generator
9
Stator – Liquid Cooled Windings
10
Step-Up Transformer
11
Transmission Line
12
Substation
13
Inside the Butler Building
14
Metal Enclosed Switchgear