Before The hardwood in the ceiling gave a warm feeling to the pool.
2
Before A water aerobics class while the roof was fully functional
3
Before The roof was still fully functional during the Halloween Thing of ’03.
4
Before During slide installation Winter 2004
5
Then the roof started to leak
6
Then came the rain…
7
Under construction The hard wood beams are being removed
8
Obstacles After one of the major snow storms this winter 2006.
9
Taking shape. The foundation of the Aquatics Center starts to develop a new skeleton. June ’07
10
Making progress. Setting the steel supports into place. June ’07
11
Progress continues. Sunshine and steel – a great combination for this construction project. June ’07
12
A roof. The progress continues and the beginnings of a roof emerge. July ’07
13
Growth. Looking inside, at the wall where the diving boards used to be. A roof develops. July ’07
14
As the work continues… Visit us again for more photos and information on the Aquatics Center’s amazing metamorphosis.