1
Caltrans, District 11 LAUREL STREET OVERCROSSING 1/16/2014
2
Caltrans, District 11 Partnership This is a City of San Diego project on a City owned bridge The State is a partner in order to facilitate the engineering The Federal government is funding the majority of the construction cost The State has contributed close to $5 million
3
Caltrans, District 11 SUMMARY OF PROJECT Rehabilitate external surface concrete & power wash bridge Make it STRONGER 1.Retrofit the columns with more concrete and tensioned cables 2.Tie it horizontally with post tensioning and steel pins - to restrain the mid-span joints 3.Deck: Replace existing pavement, improve deck drainage Abutments: Rehabilitate all concrete, improve access for inspectors Install accent lighting
4
Caltrans, District 11 Rehabilitate the external column concrete
5
Caltrans, District 11 Scaffolding will be utilized in the rehabilitation
6
Caltrans, District 11 Rehabilitate the undersides especially the mid-span joint area on the arches
7
Caltrans, District 11 Deck work: January through April 2014 2
8
Caltrans, District 11 Why Make the Bridge Stronger?
9
Caltrans, District 11 Make the Bridge Stronger Retrofit: Add 10 of thickness and tensioned cables @ east/west walls
10
Caltrans, District 11 Make the Bridge Stronger Install post tensioning, steel shear pins and new concrete to restrain the mid-span joints Joint Detail
11
Caltrans, District 11 Make the Bridge Stronger
12
Caltrans, District 11 Footings: To remain undisturbed Pier 4, existing view
13
Caltrans, District 11 Accent/Aesthetic Lighting Pier 4, Photo simulation of light standard in ground at night
14
Caltrans, District 11 Accent/Aesthetic Lighting
15
Caltrans, District 11 CONSTRUCTION SCHEDULE June 2014
16
Caltrans, District 11