1 Transmission Planning Code
Thursday 03 April 2008 Bogdan Kowalewicz OFGEM

2 Background TPCR Third Consultation - March 2006
highlighted 5% flow margin and queried if it was becoming less justified TPCR Initial Proposals - June 2006 expressed view that 5% flow margin, uniformly applied, was no longer appropriate TPCR Updated Proposals - September 2006 considered wider review of forecasting and network planning, not just a reform of flow margins TPCR Final Proposals - December 2006 outlined review of forecasting and planning and clarified NGG’s role in facilitating this process

3 Aims Greater transparency and clarity for system users
Better consistency, especially when faced with changing patterns of flow across the network in future Improve quality of information available

4 Licence Requirements The transmission planning code shall cover all material technical aspects relating to the planning and development of the pipe-line system, including: a methodology to determine the physical capability of the pipe-line system the detailed assumptions that NGG uses

5 Next Steps Outline of methodology Applicability of flow margins
Workshops to address the relevant issues including discussion on the following: Outline of methodology Applicability of flow margins Assumptions used in modelling