Download presentation
Presentation is loading. Please wait.
Published bySuhendra Pranoto Modified over 6 years ago
1
Larry Tash Director of School Redesign, LAUSD February 8, 2008
BLOCK OR NOT? Alternative Schedules to Support Increased Student Achievement Larry Tash Director of School Redesign, LAUSD February 8, 2008
2
Office of School Redesign
3
FIVE STEPS FOR SYSTEMIC CULTURE CHANGE
Building vision, beliefs, and expectations Improving instructional practice Creating increased personalization Developing supporting structures Providing strong transitional support
4
Planning for Improved Student Achievement
Curriculum, Instruction, & Assessment Personalization IMPROVED STUDENT ACHIEVEMENT Structure
5
then Learning is the Variable
If Time is the Constant, then Learning is the Variable or If Time is the Variable, then Learning is the Constant
6
What Must You Consider? Instructional Goals Operational Goals
Alternative Schedule Choices Advantages/Disadvantages Consideration (if any)
7
Block Schedule Preparation
Operational Considerations: Did you initiate faculty and community discussions acknowledging “Form Follows Function”? Does the critical mass support Block Scheduling? Have you considered flexible scheduling? Have you considered all district and state policies? Have you built in to your plan an ongoing evaluation process?
8
Block Schedule Preparation
Instructional Considerations: How will block schedule support improved student achievement? Will the block increase student engagement in their learning? Will the block allow for greater personalization? Will sufficient time for teacher preparation be available? Have you considered the negative aspects of block scheduling?
9
Traditional (Six Periods)
Year-Round Homeroom 19 17 Period 1 54 61 Period 2 Period 3 Period 4 Period 5 Period 6 Passing 35 Total Minutes 378 418
10
Alternative Schedule Activity: TRADITIONAL SCHEDULE
Advantages Disadvantages
11
7-Period Day Traditional Year-Round Homeroom 21 19 Period 1 46 52
Passing 35 Total Minutes 378 418
12
Alternative Schedule Activity: 7-PERIOD DAY
Advantages Disadvantages
13
8-Period AB Block Traditional Year-Round Homeroom 18 Period 1/5 85 95
Passing 20 Total Minutes 378 418
14
Alternative Schedule Activity: 8-PERIOD AB BLOCK
Advantages Disadvantages
15
4x4 Block (4 Periods/Quarter)
Traditional Year-Round Homeroom 18 Block A 85 95 Block B Block C Block D Passing 20 Total Minutes 378 418
16
Alternative Schedule Activity: 4x4 Block
Advantages Disadvantages
17
8-Period AB +1 Block or 4x4 +1 Block
Traditional Year-Round Homeroom 18 Period 1/5 (A) 70 80 Period 2/6 (B) Period 3/7 (C) Period 4/8 (D) Interv/Enrichment 55 Passing 25 Total Minutes 378 418
18
Alternative Schedule Activity: 4X4 +1 BLOCK
Advantages Disadvantages
19
Alternative Schedule Activity: 8AB +1 BLOCK
Advantages Disadvantages
20
Rules of Engagement State Regulations Physical Education
Union Contract School Staff and Community Mutual Support
21
Meeting P.E. Requirements
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.