Download presentation
Presentation is loading. Please wait.
Published byJaclyn Cogbill Modified over 10 years ago
1
TUSD Facilities Update November 8, 2010
2
Deferred Maintenance
3
What is Deferred Maintenance? TUSD – Planned Maintenance Major repair or replacement of existing school building components so that the educational process may safely continue.
4
Deferred Maintenance Eligible Repairs Floor Covering Painting Electrical Classroom Lighting Roofing Plumbing HVAC Wall Systems Paving Underground Toxic Tank Asbestos Lead
5
Typical Facilities Component Life Spans ComponentTimeframeRepair/Replacement Carpet15 YearsRotation Interior Paint10 Years* As Needed Exterior Paint15 Years* As Needed HVAC15 Years* As Needed Roofing20 Years* As Needed * Function and condition assessed annually
6
09/10 Deferred Maintenance Projects: ProjectSchoolExpenditure Carpet ReplacementUtt MS$135,825 Walkway Roof Replacement Beswick ES$114,640 Exterior Painting Heideman ES Tustin HS $39,407 Slurry/StripingVarious Sites (12)$119,459 $409,331
7
Proposed 10/11 Deferred Maintenance Repairs: ProjectSchoolPreliminary Budget Carpet ReplacementTustin Ranch ES$250,000 Exterior Painting(2) Sites – TBD$300,000 Roof Replacement(2) Sites – TBD$200,000 Slurry/StripingVarious Sites – TBD$100,000 HVAC ControlsVarious Sites – TBD$100,000 Replace HVAC UnitsVarious Sites – TBD$250,000 $1,200,000
8
Building Program * This presentation includes construction projects that are funded from a number of sources including: CFDs, General Obligation Bonds (Measure G & L), and Statewide school construction bonds.
9
Completed Projects 2010: ProjectBudgetStatus Orchard Hills K-8$56,000,000Complete FHS Pool Replacement$ 3,900,000Complete BHS Field Replacement$ 200,000Complete * THS Summer Modernization$ 5,600,00098% Complete * Math/Special Education Remodel and Building 230 HVAC $65,700,000
10
Orchard Hills K-8 - Adminstration
11
Orchard Hills K-8 - Library
12
Orchard Hills K-8 - Gymnasium
13
FHS Pool Replacement
15
BHS Field Replacement – Progress Photo
16
BHS Field Replacement - Completion
18
THS Summer Modernization - Courtyard
19
THS Summer Modernization - Exterior
20
THS Summer Modernization – Special Ed.
21
THS Summer Modernization – Math
22
Projects in Construction ProjectBudgetStatus Heritage School$12,000,00070% Complete THS Science Center$ 11,800,00060% Complete FHS Locker Room Remodel$ 4,500,00095% Complete $28,300,000
23
Heritage School - Administration
24
Heritage School - Multipurpose
25
Heritage School – Storm Drain Filtration
26
Heritage School – Classroom Building C
27
THS Science Center - Exterior
29
THS Science Center – Interior Stairs
30
THS Science Center - Classroom
31
FHS Locker Room Remodel - Exterior
32
FHS Locker Room Remodel - Restrooms
33
FHS Locker Room Remodel - Showers
34
FHS Locker Room Remodel – Lockers
35
Proposed Future Projects 2010/11 ProjectCost EstimateStatus BHS Snack Bar/Restrooms$600,000DSA Review THS Gymnasium$ 9,000,000DSA Approved FHS Events Center$10,500,000DSA Approved MS Multipurpose Facilities$20,000,000DSA Review * Currie Modernization$ 4,100,000In Design * Building 400, 500 & 600 $44,200,000
36
Building Program Summary CategoryBudget Completed Projects 2010$65,700,000 Projects in Construction$28,300,000 Proposed Future Projects 2010/11$44,200,000 $138,200,000 * The referenced construction projects are funded from a number of sources including: CFDs, General Obligation Bonds (Measure G & L), and Statewide school construction bonds.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.