Presentation is loading. Please wait.

Presentation is loading. Please wait.

Japan PV Automation Committee Liaison Report

Similar presentations


Presentation on theme: "Japan PV Automation Committee Liaison Report"— Presentation transcript:

1 Japan PV Automation Committee Liaison Report
EU PV Automation Committee March 27, 2012 Berlin, Germany

2 Leadership Committee Co-chairs Terry Asakawa /Tokyo Electron
PV Automation Committee representative to the JRSC GCS voting member Emi Ishikawa /Atelier Ishikawa Makoto Ishikawa /Nisshinbo Mechatronics JRSC appointed Makoto Ishikawa a co-chair as proposed by the Japan PV Automation Committee on Dec. 5, 2011.

3 Current Committee Organization
Japan PV Automation Committee Terry Asakawa /Tokyo Electron Emi Ishikawa /Atelier Ishikawa Makoto Ishikawa /Nisshinbo Mechatronics Global PV EIS TF Takashi Murakami /Tokyo Electron Makoto Ishikawa /Nisshinbo Mechatronics PV Transport Carrier TF Koji Ohyama /Dainichi Shoji Shuichi Inoue /Miraial EIS: Equipment Interface Specification

4 Meeting /Event Information
Last Committee Meeting December 5, 2011 SEMI Japan, Tokyo, Japan The Workshop on “Horizontal Communication” December 6, 2011 during PV Japan 2011 About 30 attendees See Next Committee Meeting April 11, 2012

5 “Horizontal Communication” Promotion
JA PV Automation Committee and JA PV EIS TF made presentations in following meetings and a forum to promote “Horizontal Communication” standard to China and Korea 6th Feb. China PV Committee Meeting Liaison Report 8th Feb. Korea I&C Committee Meeting “Lilac Liaison Report” 20th March International PV Standard Forum in SOLARCON China Presentation

6 Task Force Updates Global PV-Equipment I/F Specification Task Force
PV Transport Carrier Task Force 6

7 Global PV-Equipment I/F Specification TF 1/3: TF Operation
Leadership JA: Takashi Murakami /Tokyo Electron Makoto Ishikawa /Nisshinbo Mechatronics EU: Martin Zenning /Jonas & Redmann Mathias Glaser /Manz Automation Charter Study and development of a suite of equipment communication interface related standards for photovoltaic (PV) production systems. The study will lead to development of standards that are optimized to reduce costs with well-fit definitions and specifications to the requirement of real-world PV manufacturing operation. Scope Development of a suite of standards on communication interface between equipment or between equipment and factory for photovoltaic (PV) production systems. “Global Task Force” since July 12, 2011 Decisions on ballots, SNARFs, etc. should be based on global consensus.

8 Global PV-Equipment I/F Specification TF 2/3: Doc. #4804 HC
Submitted Doc. #4804 HC, “New Standard: Specification for Horizontal Communication between Equipment for Photovoltaic Fabrication System” for Cycle 4, 2011. Focuses on Horizontal Communication between equipment. Material and Material Data Transfer, and General Data Transfer Had face-to-face meeting and multiple teleconferences with EU TF to draft the document. JA and EU agreed to split data definition and media interface out from Doc. #4804 to incorporate them into its subordinate standards. Failed committee review on July 21, 2011. Drafting Doc. #4804A. Expects to submit ballot for Cycle 3, 2012.

9 Global PV-Equipment I/F Specification TF 3/3: Subordinate Standards to Doc. #4804
2 SNARFs were approved at Japan PV Automation Committee meeting on April 12, 2011. Doc. #5222 New Subordinate Standard: Data Definition Specifications for a Horizontal Communication between Equipment for Larger Sized Substrate Oriented Photovoltaic Fabrication System to Doc. #4804 “Specification for a Horizontal Communication between Equipment for Photovoltaic Fabrication System” Doc. #5223 New Subordinate Standard: Media Interface Specifications for a Horizontal Communication between Equipment for Larger Sized Substrate Oriented Photovoltaic Fabrication System to Doc. #4804 “Specification for a Horizontal Communication between Equipment for Photovoltaic Fabrication System”

10 (Application Specific)
Doc. #4804 HC and its Subordinate Standards Data Definition (Application Specific) JA: Doc. #5222 “For Larger sized substrate” EU: Doc. #5153 “For crystalline" Doc. #4804 HC Main Body (Common Part) Media Interface (Application Specific) JA: Doc. #5223 “For Larger sized substrate” EU: Doc. #5154 “For Profibus implementation for crystalline” 10

11 PV Transport Carrier Task Force
Leader Koji Ohyama /Dainichi Shoji Shuichi Inoue /Miraial Charter To promote standardization of transport carriers used for the photovoltaic production processes. Scope Plans to specify following topics for transport entities: Mechanical interface to equipment load port (ground plate) Material handling interface Mechanical interface to transport system (manual (e.g., PGV) or automated (e.g., Conveyer belt)) ID System requirements Adapters to handle smaller wafer sizes Japan TF intends to function as a liaison part of EU TF. There’s not been so much progress in the EU PV Transport Carrier TF.

12 Danke schön! For more information, please contact:
Akiko Yamamoto, SEMI Japan


Download ppt "Japan PV Automation Committee Liaison Report"

Similar presentations


Ads by Google