Presentation is loading. Please wait.

Presentation is loading. Please wait.

Submission Title: [Task Group 1 Opening Report]

Similar presentations


Presentation on theme: "Submission Title: [Task Group 1 Opening Report]"— Presentation transcript:

1 Project: IEEE 802.15 Working Group for Wireless Personal Area Networks (WPANs)
Submission Title: [Task Group 1 Opening Report] Date Submitted: [13Jul00] Source: [Ian Gifford] Company [M/A-COM, Inc.] Address [1011 Pawtucket Boulevard Lowell, MA USA ] Voice:[ ], FAX: [ ], Re: [-00/095r0, etc.] Abstract: [TG1 chair report to WG. By Tom Siep for Ian Gifford] Purpose: [TG1 chair report to WG to update them from the on all the work items.] Notice: This document has been prepared to assist the IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by July 2000 doc.: IEEE /176r0 July 2000 Ian Gifford, M/A-COM, Inc. Ian Gifford, M/A-COM, Inc.

2 IEEE 802.15 Working Group for Wireless Personal Area Networks™
July 2000 doc.: IEEE /176r0 July 2000 IEEE Working Group for Wireless Personal Area Networks™ TG1 Report #2 July 2000 La Jolla, CA USA Ian Gifford, M/A-COM, Inc. Ian Gifford, M/A-COM, Inc.

3 July 2000 doc.: IEEE /176r0 July 2000 TG1 Summary All technical, most “E” LB3 Comments resolved, summarized in –00/159r7 worksheet. LB3 Comment Resolution 10-13Jul00, post meeting, and possibly into Aug00. Once resolved, apply edits from 00/159r7, BSIG v1.1, et. al. to next Draft LB(4) Recirculation, est. Sep00 Draft ready for Sponsor Ballot prior to Nov00 Plenary a possibility, but not likely Ian Gifford, M/A-COM, Inc. Ian Gifford, M/A-COM, Inc.

4 TG1 Scottsdale 2000 Objectives
July 2000 TG1 Scottsdale 2000 Objectives Comment Resolution follow-up Begin production of D0.8 Plan for production of D1.0 See 00/181r0 for details of planning process Ian Gifford, M/A-COM, Inc.


Download ppt "Submission Title: [Task Group 1 Opening Report]"

Similar presentations


Ads by Google