Our Track Record in Offshore Wind
WTG Foundations Greater Gabbard Sherringham Shoal Gwynt y Mor Riffgat Borkum West II Meerwind Sud/Ost Baltic 2 Dudgeon Substations Greater Gabbard / Galloper Thanet Anholt Nordsee Ost Westermost Rough Dan Tysk Sylwin HVDC Sandbank Dong x 5 10 November 2018
4
Key Differences (1) Developers tend to be from an onshore utility background. Consenting / environmental specialists Legal teams Financiers Cost controllers Onshore electrical / SCADA specialists Wind resource specialists Limited marine / offshore experience. Remote procurement teams Systems you haven’t heard of. Forms of Contract you haven’t heard of. Liabilities / Warranties more onerous than you are used to. 10 November 2018
5
Key Differences (2) Offshore wind developers consider the oil & gas supply chain to be: Working in a location further offshore than their project. Focussed on different H&S issues. Dirty (environmental focus) Expensive, gold plated / over specified. Bespoke. Slow to innovate. Arrogant. Risk averse. They’ve never heard of you! For market entry you need a good pitch, a good track record and offer something special or irresistible!
6
Key Differences (3) Developer’s (driven by project finance / banks) want fewer contracting interfaces. 20+ down to 3 contracts Large EPCI contracts Forces collaboration SME encouraged to talk to Tier 1 contractors. Developer’s (driven by banks) want to offload project risks to the supply chain. Cost reduction agenda High levels of repetition & standardisation Opportunities for innovation 10 November 2018
7
Forms of Contract
8
Beatrice (SSE 50%, Repsol 25%, CIP 25%)
498MW (83 x 6MW) The Offshore Wind Alliance: Siemens Wind Siemens STDL Seaway Heavy Lifting Bifab Atkins 10 November 2018
9
Moray (EDPR 67%, Repsol 33%) 504MW (63 x 8MW)
Vertically Aligned EPCI Packages Wind Turbines Wind Turbine Foundations Design Competition MV Cabling MV/HV OSP Export Cable Onshore Works 10 November 2018
10
Inch Cape (Repsol 51%, EPDR 49%)
584MW (73 x 8MW) 2 main work packages: Wind Farm Balance of Plant EPCI Transmission Works EPCI Bidders: ABB Alstom Grid Boskalis Ballast Nedam - Ferrovial DEME Geosea Siemens T&D Seaway Heavy Lifting Marubeni - Technip Van Oord 10 November 2018
11
Neart na Gaoithe (Mainstream)
450 MW (75 x 6MW) Preferred Contractors: Siemens Wind DEME Geosea Siemens STDL / Prysmian 10 November 2018
12
Are there any new innovative techniques or equipment that have been developed specifically for this industry?
13
Supply Chain Contacts Finlay.Smart@Subsea7.com +44 1224 527261
Title Presentation 10 November 2018
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.