Presentation is loading. Please wait.

Presentation is loading. Please wait.

MT Division BMAZ Bangalore

Similar presentations


Presentation on theme: "MT Division BMAZ Bangalore"— Presentation transcript:

1 MT Division BMAZ Bangalore
11/10/2018 MT Division BMAZ Bangalore MT Hi-Tech Lab (ISO 9001:2008 Certified)

2 Technical Activities Testing of Various Meters:-
11/10/2018 Technical Activities Testing of Various Meters:- Single Phase Static Meters LT Three Phase Static Meters HT Three Phase Static Meters 2. Testing of CT/PT’s

3 Test Equipments Available
11/10/2018 Interface Software used for testing of meters – CamCal. Details 3 Phase Meter testing Single phase Meter Testing CT/PT testing Make MTE, Germany Eltel systems, Doddaballapur, Bangalore Accuracy Class 0.02s 0.005 – CTs 0.05 – PTs Date of commissioning Test positions 10 40 01

4 Various tests conducuted
11/10/2018 I. Meters :- (As per IS & 14697) 1, Accuracy test at different Loads and Power factors 2. Starting current test. 3. No load test 4. Meter constant test . II. CT/PTs : (As per IS 2705 and 3156) 1. Accuracy test w.r.t. Ratio error 2. Accuracy test w.r.t. Phase angle error

5 Duration of testing and Testing fee details
11/10/2018 Duration of testing and Testing fee details Sl No Description Time Required (Testing and Meter fixing and Releasing) Test fee in Rs (for meters purchased by consumers only) 1 Single Phase Uni-directional Meter (40 Meters at a time) 1 Hr 30 Min. 100 / meter 2 Single Phase bi-directional Meter 3 Hrs to 4 hr 200 / meter 3 LT 3 phase uni directional Meter (10 Meters at a time) 1 Hr 1000 / meter 4 LT 3 Phase bi directional Meter 2 Hr 30 Min 1800 / meter 5 HT uni directional Meter 2 Hours 1000/meter 6 ABT featured HT bi-directional Meter (10 Meters at time) 4 Hours 2400 / meter 7 Current Transformer (One CT at a time) 5 Min 600 /CT 8 Potential Transformer (One PT at a time) 400 / PT

6 Physical Progress of Meters tested – Last 4 years
11/10/2018 Physical Progress of Meters tested – Last 4 years Sl. No Meter Type No. of Meters tested and Sealed (UPTO Apr) 1 LT Three Phase Whole Current Energy meters (5-30A) (Meters sealed) (Retail outlet/sBESCOM stopres) 42817 45918 41598 47093 3500 2 LT Three Phase CT Operated Energy Meters (- /5A) (Retail outlet/stores) 11700 7199 8567 9133 3 HT Meters (purchased by consumers) 1075 1572 1397 1446 138 4 Single Phase Static Meters (Retail outlet and Stores) 11733 2378 6397 12649 544 5 Solar roof top 3 ph meters 23 11 6 Solar roof top single Ph meters 19 7 RAPDRP secure meters HT CT operated 4894 8 Prepaid meter (3 ph and 1 ph) 3430 Total Meters/Sealed 67325 57067 57959 78687 4204

7 Physical Progress of CT/PT’s tested (Since 23-5-2014)
11/10/2018 Physical Progress of CT/PT’s tested (Since ) Description (Upto Apr) Total No. of HT CTs 4222 464 4686 No. of HT PTs 3662 408 4070 No. of LT CTs 45


Download ppt "MT Division BMAZ Bangalore"

Similar presentations


Ads by Google