Stockbridge, Georgia pipe plant
2
A LITTLE HISTORY about the plant….
CONSTRUCTED IN 1981 THE PACKERHEAD UTILIZES OVERHEAD CRANE STRIP ONE AUTOMATED WIRE ROLLER CAGE DEPARTMENT DESIGN NARROW LAYOUT
3
CHALLENGE #1 – better loading process
THERE WAS A NEED FOR LESS WEAR AND TEAR ON THE MACHINE AND BUILDING. PLACE ON TABLE CORRECTLY, THE FIRST TIME. MAKE IT EASY!
4
CHALLENGE #2 - TIME ROLLING STOCK
WHAT COULD EVERY PLANT USE MORE OF??? ROLLING STOCK CONSERVATIVE ESTIMATE – 1 HOUR/DAY WASTED TRACKING DOWN A FORKLIFT TO LOAD THE WIRE ROLLER.
5
CHALLENGE #3 – Safer way to cut SPLICES and bands
A NEED FOR BETTER ERGONOMICS
6
PLANNING A NORMAL DAY OF PRODUCTION CALLS FOR 3 ROLLS OF WIRE MESH FOR THE BIDI-48 DESIGN A TABLE THAT HOLDS A DAY’S PRODUCTION.
7
PLANNING ELIMINATE THE NEED FOR A FORKLIFT (ONCE THE ROLLS ARE LOADED)
DESIGN A SYSTEM THAT ADVANCES THE ROLLS SAFELY.
8
PLANNING ALLOW THE OPERATOR TO SAFELY WORK AS ONE WITH THE SYSTEM
LOCK ROLLS IN PLACE WHEN “ON DECK” GUARD SYSTEM FOR POTENTIAL SLIPS AND FALLS
9
Final product – “MESH WIRE ROLL CLIP”
10
Allows for cutting towards the top of the roll
11
Cutting platform – less than 4 feet
12
Swing gate for cutting platform access
13
Stops – lever release system
14
AIR ASSIST JACK
15
Foot Pedal
16
Improvement idea from employee’s – guard for potential slips
17
Costs ~$2300 SCRAP MATERIAL FROM A DECOMMISSIONED BRIDGE CANE, ” I-BEAM, (2) 16’ SECTIONS ($0) AIR ASSIST JACK AND PUMP ($1,100) EXPANDED METAL AND ANGLE ($700) MISC MATERIALS ($500)
18
INTANGABLE COSTS SAFER AND MORE EFFICIENT EMPLOYEE SATISFACTION
PRIDE - TEAM ACCOMPLISHMENT FUTURE SAVINGS – TWO MORE PLANNED FOR THE DRY CAST DEPT.
19
SPECIAL THANKS REGGIE ELKINS (PLANT MANAGER)
JASON HARRIS (YARD SUPERVISOR) ALFREDO FLORES (MAINTENANCE MANAGER) GABE JACKSON (MAINTENANCE ASSIST.) CAGE DEPT. – TITO RIVIERA & CHRIS CARTER