Investment Work Package I.2 H2 to Transportation Fuels:

Similar presentations


Presentation on theme: "Investment Work Package I.2 H2 to Transportation Fuels:"— Presentation transcript:

1 Investment Work Package I.2 H2 to Transportation Fuels:
Solar-fueled H2 refueling station (HRS) Galway, March 21st 2018

2 Agenda WP Progress Design Results Procurement Process Steps Ahead

3 WP Progress 2018 2019 2020 Permits Risk A&M Procurement Installation
Status March 2018 2018 Risk A&M Procurement Installation 2019 Commissioning Analysis Installation Monitoring Analysis Installation Replication 2020 SWOT

4 Fig1.H2 Refueling Station Location (Source Google Maps)
WP Design Results PV Array Fig1.H2 Refueling Station Location (Source Google Maps) Station (Incl. security clearance) IZES GmbH SCOPE Location: Innovation Campus Saar Saarbrücken, Germany Semi-Autonomous Operation (PV Array) 700 barg loading Seasonal and Loading Storage (1 Vehicle)* Peak Production Expansion Water Treatment Unit Containerized Solution Monitoring and Plant Management System

5 Main Distribution Panel
WP Design Results Dispenser 700 barg 4,2 kg H2 594 km LT:15 min PV Array DC/AC 35 kWp Electrical Grid 70 KVA/3Ph/400V Main Distribution Panel Electrolyzer PEM Technology 6,25 Nm3 H2/hr @35 barg Compressor Bank Multi-Stage @900 barg (Seasonal and Loading) Storage* 55 kg H2 (Seasonal & Loading) Water Supply 30 barg

6 WP Risk and Mitigation Respect securtiy distances to buildings and storages (3 m Horizontal, Vertical Vent Clearance) Noise Levels: <65 dBA in operation >45 dBA idle Third Party certified Permit Process Route: Supplier & IZES => ZÜS & TÜV (Comissioner) => Construction and Operation Authorities

7 WP Design Results ..\Meeting Personal\GenComm Station Final skp

8 WP Procurement Process
Preparation of RFO as a basis for Suppliers (2 Offers Received/2 Pending ) Turn-Key Solution, Self-Contained, Outdoor Solution. Components: Electrolyzer: Initially PEM, 5 Nm3/hr Water Treatment Plant Gas Conditioning Equipment: 99,999% of H2 with levels of Oxygen and Water under (<) 5 ppm Compression Bank: Sufficient to load bars Storage Tank: 50 Kg- Minimum Overall (Flexible for different pressure steps) Dispenser: Sufficient to load bars. LT: 30 mins Facility Control System: Plant Slave of the PV Array/Normal Mode Warranty: 1 Year (Yearly Extensions) *The plant will not be fully fit for a commercial application! (Modelling should resolve this!)

9 Steps Ahead and Pass-Down
Define Supplier Start Lead Time Finish Design based on Proposed Solution Start creating necessary documentation for ZÜS-TÜV approval Pass Down: Wulf will take the IZES Responsibilities (Monthly Reports/Telco’s) Wulf vast experience can be of use for the I1 & DST Communications Role to be cleared with Anne (Offline next week) Personal

10 Thanks! IZES gGmbH Contact Points Bodo Groß, gross@izes.de