PRASA PCOT Meeting 30 – 31 August 2016
2
Content Implementation of the 2016/17 Annual Performance Plan
Summary of 2015/16 Performance Status of performance Quarter 1 on APP Implementation of the recommendations of the 2015 Budgetary review and recommendation report Progress on Rolling Stock Fleet Renewal Programme. Metrorail service delivery in Metro’s
3
Implementation of the 2016/17 APP
4
Summary of performance 2015/16
45% of targets were achieved – Up 15 percent from 30% in 2014/15. Whereas Rail Operations did not achieve any targets in 2014/15 in 2015/16 they met 50% of the targets. Note : Partially achieved – Variance less than 5%
5
Status of performance Quarter 1 2016/17
HIGHLIGHTS: 79 Metrorail coaches for quarter in target range between 77 – 93 coaches completed Public injuries and fatalities at 1.77 within range set between 1.05 – 2.3 Crime incidents on assets 752 within range set of between 581 – 764 incidents MLPS passengers of within the range set of between – passengers. 11 MLPS coaches complete higher than range set of 6-8 coaches Only 0.57 injuries per passengers for Autopax well below the range of 3 – 4.5. Only 0.6 breakdowns per km for Autopax well below the range of 1 – 1.1. Duff’s Road station modernisation completed thus 1 target completed for 2016/17 (1-2 stations) Facility for housing the testing and commissioning of new trains handed over to GIBELA. Signalling target of commissioning 2 station Interlockings in Gauteng completed. 197 employees in training above the range of for quarter 1. The lower limit for 2016/17 of 200 – 250 employees met in July with 206 employees in training. Spending on designated group – Black Women Owned at R338.6m above the range for between R222m – R242m. CHALLENGES Passenger environment challenge: Metrorail (passengers, trains on time and availability, passenger injuries & fatalities index, crime incidents involving passengers) Autopax passengers Project delays: Pienaarspoort Deployment corridor, PRASA Technical (120km/h track project)and Intersite (Umgeni development). Spending on BWO: Largest amounts go to Construction (CRES & TECH), Refurbishment & Upgrade of coaches (TECH), Repair of rolling stock equipment (Rail), maintenance (Rail). Challenges: Pienaarspoort deployment Corridor involves the infrastructure readiness as well as the operational readiness (train operations, customer services, security and maintenance). The Provisional Acceptance certificate for Train 1 is delayed; the stray current project completion date December 2016; platform rectifications will also still be in progress. PRASA Technical – The 120km/h track tender is one the major supporting infrastructure works to commence for the deployment of the new trains. The target was to ensure completion of the tender and contracting work in 2016/17 so that work can commence in 2017/18. The Intersite project in Umgeni is dependent on the approval from the EThekwini municipality. The approval is subject to a period of 21 days for any objections. (This expires August 2016). (Target was to have this completed by end Quarter 1).
6
Status of Implementation – Metrorail Challenges
Action plans to address challenges: Recovery plans for Rolling Stock and Infrastructure. (Detail in next slides) Combining work of PRASA Rail Engineering and PRASA Tech to collectively address infrastructure and rolling stock issues Security action revolve around interventions to address hotspots and targeting scrap metal dealers, working with the SAPS (Detail in next slides) Acting GCEO regional visits to provide focus on problem areas Acting GCEO visits to suppliers of Rolling Stock programme to assess capacity
7
Status of Rolling Stock
Out of service coaches waiting for components, light defect repairs and maintenance (55% waiting for components) Refurbishment due to General Overhaul programme Incident repairs due to collisions, derailments and arson. Contractor Ad-hoc repairs mainly due to cable vandalism International peers keep between 5 – 10% spare sets (slack) to ensure high reliability of service. This requires the blue line to be at just below the green line to achieve high reliability in Metrorail.
8
Recovery plans: Rolling Stock
Key lever to utilize GO Contractors to repair out of service coaches due to component failures, theft damage & vandalism of cables. Transnet Engineering committed to deliver on GO programme and closer working relationship with TE established. Procurement process for new component contracts underway and one of the mission critical components, rotary machines, are already in evaluation. Current contracts extended a number of times for GO’s & components - identified as irregular by AG. Levels of critical components in depots to be maintained for quick repair turnaround time. Super-shedding – block trainset working to ensure maintenance stability and all repairs affected to increase distances between failures.
9
Status of Infrastructure
Impact of infrastructure on train performance Condition of Perway Maintenance backlog - Electrical Train delays and cancellations affects the customer experience. Kilometres under speed restriction (to ensure safe travel) affects the running of trains. Quality of the rail track measured by Track Quality Index (TQI) affects the experience of safety and ride quality of the train journey
10
Recovery plans: Infrastructure
Key levers to use OEM (Original Equipment Manufacturer) contractors (Signalling) and Transnet to assist in addressing the negative spiral in condition of assets Requires special dispensation on extended line occupations, resource allocation and exceptional support to realise the desired outcomes. Methodology for execution in guidelines for each region includes Clustering of rehabilitation works to be effected thus executing at same time on a section / cluster of sections / entire corridor. Risk assessments to unearth necessary mitigation actions to minimise risks to tolerable levels. Document extraordinary actions in addition to Standard Operating Procedures for governance Avoid compromising safety procedures
11
Security around assets and passenger protection
Successes achieved with SAPS in proactive policing on trains and stations PRASA Protection services and service providers daily focus on preventing crime, illegal crossing of railway lines and preventing fare evasion Number of arrests quarter 1 for Schedule B offences 6530 and Serious crimes 218. Suspect for train burnings in Pretoria station 23 February 2016 arrested through identification per video surveillance Amendment Act 18 of 2015 resulted in All suspects arrested for cable theft in last 3 months denied bail and remain in jail. One suspect expected to receive a sentence of 15 years for cable theft.
12
Implementation of the recommendations: 2015 Budgetary Review & Recommendation Report.
13
Status of Fleet Manufacturing – ON TRACK
Manufacture of the first set of trains is on track: Test Train 1 and 2 are currently undergoing safety critical open line testing; The 1st test train received certificate of Track-Worthiness on 21 April 2016; and The 1st train already tested for 132km/h speed.
14
Station of Construction of Local Factory
Gibela has started construction at Dunnottar Park, Ekurhuleni Sod Turning took place on the 4th March 2016 Bulk Earthworks completed. Gibela have started construction of buildings Training Centre = 4000m2 – operational by 3rd quarter of 2016/17 financial year Construction duration period of 18 months – operational by June 2017 32 South African companies already contracted for Brazil Trains
15
Progress on Job Creation and Skills Development
To date Gibela has created 449 jobs1, where: 403 are South African Citizens; 347 are Black Citizens; 336 are skilled Black Citizens; 185 are woman; and 261 are youth. Job commitments have been phased in line with Gibela’s operations Skills Development Upskilling of approximately individuals over a 10 year period To date, 337 people have been trained Gibela has further awarded 180 bursaries, worth approximately R12 million
16
PRASA Rail Service Delivery in Metro’s
17
Declining Patronage Age and condition of system is catching up with us. Loss in service capacity (train set availability). Poor service performance (rolling stock and infrastructure reliability). Commuters lost confidence in system’s reliability, security situation and lack of communication. Reluctance to pay (fare evasion) with protests against poor services. Intimidation and attacks on employees. Commuters shifting to other modes.
18
Regional Passenger Trips
19
Metrorail Performance 1st Quarter and July 2016
On-Time Availability (Cancellations)
20
Regional Trainset Availability
Train sets required per month Train sets supplied (Average ) Percentage short configured sets Coaches vandalised April - July Gauteng 132 114 59% 62 Western Cape 89 79 51% 112 KZN 57 46 21% 33 National 278 239 50% 208 Short configured sets = Less than 12 coach train set consist. Total 57 coaches destroyed/damaged by fire in 2015/16 (Gauteng and Western Cape) and 24 coaches between April – July 2016 (mainly Western Cape). Vandalised coaches take 2 – 6 weeks to return to service. Vandalism of coaches/infrastructure. Fencing and security system upgrades at depots/yards. Name and shame program (Internal employees also involved). Arrests April – June 2016: Schedule B crimes = Serious crimes = 218. Amendment Act 18 starting to deliver results. (Serious crimes against essential infrastructure). This week seen sentencing of 11 years imprisonment for theft of transformers. All suspects arrested past 3 months refused bail. One suspect stands to get 15 years for repeated cable theft.
21
5 Year Train Performance
Service capacity: 2015/16 Trains scheduled: Cancelled: (4.7%) Delayed: (19.5%) 49.6% of trains ran with shorter sets than required 12 coach configuration = trains. Gauteng: 60.6% trains ran as short configured trains. Western Cape: 43.5% trains ran as short configured trains. KZN: 32% trains ran as short configured trains.
22
5 Year Train Performance per Region
23
5 Year Train Performance per Region
24
2015/16: Rolling Stock biggest contributor to delays and cancellations
2015/16: Rolling Stock biggest contributor to delays and cancellations. Infrastructure a big contributor in train delays with TFR significant contributor in delays. Rolling Stock contributors: Shortage of train sets. Reliability of train sets (in service failures) Root causes: Average age of rolling stock – over 40 years. Obsolete/availability of components. Vandalism – over 250 coaches vandalised in 2015/16 and 54 coaches in April and May 2016. Investments to date kept the system from total collapse. Infrastructure contributors: Signalling : Age of system, openness of network, theft of copper and track side equipment. Maintenance effectiveness impacted. Perway: Formation & drainage and availability of material. Electrical : Age/condition of sub-stations. Maintenance backlogs. Encroachment of rail reserve. Service delivery protests
25
2015/16: Gauteng = RS & Infra. Western Cape = RS & Infra
2015/16: Gauteng = RS & Infra. Western Cape = RS & Infra. KZN = RS & TFR (TFR control network). Eastern Cape = RS & Infra.
26
Rolling Stock capacity – fleet availability (End 2015/16)
Coaches – March 2016 Motor Coaches Trailer Coaches Total Fleet % IN SERVICE 786 2 298 3 084 68% OUT OF SERVICE – VANDALISED 236 381 617 14% NON OPERATIONAL – FOR REPAIR (GO/WRECKS) 389 564 853 19% TOTAL FLEET 1 311 3 242 4 554 Rolling Stock Capacity 68% of the fleet is operational. 14% of the operational fleet is out of service due to vandalism in depots and yards. 50 – 60% of the repaired fleet returned for service is lost due to vandalism. All regions run shorter train sets due to shortage of rolling stock. Nationally up to 50% of trains are running as short sets instead of normal 12 coach configuration.
27
Rolling Stock and Infrastructure Recovery Plan
OBJECTIVE TARGET INTERVENTIONS Train set availability. Increase sets from 250 to 290 by December 2016. Return out of service coaches through existing GO contractors. Long term contracts for materials/supplies/components. Rolling stock reliability and maintenance compliance. Improve MDBF from 700km - >800km. Super shedding: Wolmerton and Braamfontein. Independent maintenance schedule audits. Maintenance management automation (incl. SCM). Signalling – Reduce abnormal working and safety. Reduce cancellation due to signalling from 3000 to <2500 on average. Appoint OEM’s for component and integrity tests to rehabilitate current signalling system. Rehabilitate signal lights, point machines and cabling. Replace copper to reduce panel failures. Improve perway/electrical condition maintenance. Reduce speed restrictions from 110km to <30km by March 2017. Tamping to improve alignment and quality index (currently above 6 – Should be below 2). Screening to improve formation and ballast track bed. Grinding to extend life of worn rails. Procure ultra-sonic equipment to detect risk track sections. Replace perway to reduce delays and speed restrictions. Procure and install perway components – Address procurement delays/system. Install double slips to increase flexibility and reduce delays. Replace sub-stations and OHTE to increase capacity and reduce disruptions. Improve OHTE disruptions from 400 to <300 on average. Replace major components and wiring. Rebuild/restore critical sub-stations. OHTE inspections to improve maintenance effectiveness through on-track maintenance vehicles. Corridor fencing programme to reduce theft, vandalism and community safety. New train deployment corridor and A-corridors by 2020. Deployment corridor as per RSR requirement in Gauteng. Prioritise high safety incident areas nationally. Prioritise high revenue leakage areas nationally.
28
PRASA Rail Capital program – CIP = Capital Intervention Program
A total of R 568 m has been allocated for PRASA Rail Engineering (Rolling Stock) for 2016/17:
29
PRASA Rail Capital program – CIP = Capital Intervention Program
A total of R 403m has been allocated for PRASA Rail Engineering (infrastructure) for 2016/17:
30
Security – Asset Incidents
Burning of trains. Vandalism of rolling stock. Theft and vandalism of signalling equipment. Cable theft. Vandalism of stations and fencing. Stone throwing.
31
Arson Incidents (Train Burning)
32
History of Asset related Occurrences
33
History of Asset related Occurrences
34
Security – Passenger Incidents
High levels of robberies in Western Cape
35
6 Year Security Performance
Includes: Theft of trackside and signal equipment & R/S components. Fire – commuter backlash. Vandalism and malicious damage of trackside/signal equipment and Rolling Stock Impact: Infrastructure and Rolling Stock capacity, availability and reliability. Includes: Assaults. Robbery (cell phones, personal equipment and money. Sexual offences. Murder. Impact: Commuter confidence and ridership.
36
Other matters impacting Metrorail performance
Floods in KZN at end of July 2016
37
Other matters impacting Metrorail performance
Sand on tracks – Western Cape