Download presentation
Presentation is loading. Please wait.
Published byAmbrose Sanders Modified over 6 years ago
1
WESLEYAN P-29-1 207 JUDD HALL STAIRWELL LIGHTING REPLACEMENT PROJECT
SECTION EXISTING CONDITION PHOTOS MAJOR MAINTENANCE FY 15 DATE: 01/20/14 PHOTO. NO. WESLEYAN U N I V E R S I T Y REVISIONS Construction Services 170 Long Lane Middletown, CT 06457 P-29-1
2
WESLEYAN P-29-2 207 JUDD HALL STAIRWELL LIGHTING REPLACEMENT PROJECT
SECTION EXISTING CONDITION PHOTOS MAJOR MAINTENANCE FY 15 DATE: 01/20/14 PHOTO. NO. WESLEYAN U N I V E R S I T Y REVISIONS Construction Services 170 Long Lane Middletown, CT 06457 P-29-2
3
Draft Only – Fixture Spec and Scope to be provided…
Scope of Work (Reference MMFY15 Project Manual for all general project requirements) Contractor shall remove and discard existing light fixtures. Contractor shall provide and install new light fixtures in new locations identified. Mounting requirements shall include but not be limited to unistruct attachment to underside of stair landings. Provide junction box covers for all fixtures relocated from existing wall mounted locations. New fixtures to be: Patch, prime and paint covers, conduit, wiremold, mounting systems. Draft Only – Fixture Spec and Scope to be provided… 252 CHURCH STREET OLIN LIBRARY - WEST DOOR REPLACEMENT SECTION EXISTING CONDITION PHOTOS DATE: 01/20/14 PHOTO. NO. WESLEYAN U N I V E R S I T Y REVISIONS Construction Services 170 Long Lane Middletown, CT 06457 P-29-3
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.