Download presentation
Presentation is loading. Please wait.
Published byDana Berry Modified over 6 years ago
1
Thornbury Road new green-man cycle and pedestrian crossing
2
What are we trying to achieve?
A new controlled, safe and accessible crossing Rare opportunity to create new crossing along the Great West Road To ensure local residents benefit from funds raised by the Marbaix Gardens development
3
Consult area
4
Other schemes Ridgeway speed table
Church / Osterley Road junction improvements Thornbury Road – creation of 2 northbound lanes Thornbury Avenue area CPZ
5
Ridgeway Road speed table
6
Osterley / Church Road junction
7
New Controlled Parking Zone (CPZ)
Create new passing places on Church Road Generally reduce parking pressure in area
8
Summary of responses 768 consultees 124 responses (17%) 32% in favour 61% against 7% undecided
9
Themes from the consultation
Traffic volumes (30%) Safety (21%) Inconvenience (16%) Speed (11%) Waste of money (7%) Gymkhana coach access (6%)
10
Traffic Volumes 30% of responses
11
Summary of traffic impact
Vehicles per hour 8 – 9 am* 3 – 4 pm* 5 – 6 pm* Thornbury Road (southbound, left turners) -42 -55 -51 Osterley Road (southbound) +30 +37 +42 Ridgeway Road (southbound) +12 +18 +9 Church Road (westbound) No change +5
15
Summary of traffic impact
Vehicles per hour 8 – 9 am* 3 – 4 pm* 5 – 6 pm* Thornbury Road (southbound, left turners) -42 -55 -51 Osterley Road (southbound) +30 +37 +42 Ridgeway Road (southbound) +12 +18 +9 Church Road (westbound) No change +5
16
New Controlled Parking Zone (CPZ)
Create new passing places on Church Road Generally reduce parking pressure in area *live from 20th February
17
Safety 21% of responses
18
Osterley / Church Road junction
19
Osterley / Church Road junction
20
Speed (11% of responses)
21
Speed data (85th percentile)
Location Northbound Southbound Thornbury (2012) 30.1 29.8 Osterley Road (north) 32.7 30.6 Osterley Road (south) 31.1 28.9 Church Road (west) 25.7 25.9 Church Road (east) 24.6 25.1 Between A4 and Church Road 25.8 Between Church Road and College Road 19/20 20/21
22
Ridgeway Road speed table
23
small increase in journey times by car (approx. 1-2 mins at most)
Inconvenience small increase in journey times by car (approx. 1-2 mins at most) Advantages Increased convenience and safety for pedestrians and cyclists. (children and those with mobility issues)
24
Waste of money Marbaix Gardens (s106 – not taxpayer) Site specific junction improvements
25
Gymkhana access Minibuses / Small Coaches
26
Gymkhana access Large coaches (over 10.5m)
27
To conclude Thorough consultation process Issues raised Number of mitigating measures
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.