Presentation is loading. Please wait.

Presentation is loading. Please wait.

Draft Technologies RICK COX, B.B.A., BREWER.

Similar presentations


Presentation on theme: "Draft Technologies RICK COX, B.B.A., BREWER."— Presentation transcript:

1 Draft Technologies RICK COX, B.B.A., BREWER

2 What you will learn Storage Techniques Proper pouring of Draft Beer
Draft equipment and systems Cleaning of draft equipment and lines Glassware cleaning

3 Text Draught Beer Quality Manual; Brewers Association, Second Edition
Prepared by the Technical Committee of the Brewers Association

4 Draft Equipment and System Configurations
3 general types Temporary Systems Picnic taps Jockey box Stainless Steel coils Plate chiller

5 Draft Equipment and System Configurations
Picnic Tap Handle

6 Draft Equipment and System Configurations
Beer Chiller Plate

7 Draft Equipment and System Configurations
Jockey Box

8 Draft Equipment and System Configurations
Direct Draw Systems Kegerator Towers Pass through Surface mount drip tray Walk-in cooler Faucet Wall mount drip tray Shadow box Forced air Glycol

9 Draft Equipment and System Configurations
Kegerator

10 Draft Equipment and System Configurations
Walk-in Cooler

11 Draft Equipment and System Configurations
Long Draw Systems Components Barrier Tubing Comes in bundles Glass smooth Inhibits mineral stone Inhibits microbial growth Only barrier tubing is approved for long-draw systems Vinyl and polyethylene tubing are NEVER used

12 Draft Equipment and System Configurations
Foam on Beer Senses foam and stops the flow of beer through lines Reduces loss Located on wall or in a coupler

13 Draft Equipment and System Configurations
Foam on Beer (FOB) Detector

14 Draft Equipment and System Configurations
Beer Pumps Draws beer from keg or SV In systems where gas pressure exceeds psi In very long run systems In high vertical lift systems Powered by High pressure gas Compressed air Must be well cleaned and have diverter or back flush fitting Use quick connect/push fittings

15 Draft Equipment and System Configurations
Beer Pump

16 Gas Carbon Dioxide (CO2) Nitrogen Gas (N2) Blended gas bottles
Primary gas used to dispense draft beer Must be food grade Nitrogen Gas (N2) Blended with CO2 Aids in delivery in systems above CO2 equilibrium Not easily absorbed by beer Will not over carbonate beer Blended gas bottles Vendor mixed 70% CO2 / 30% N2 25-30% CO2 / 70-75% N2

17 Cooling Forced air long draw Glycol-cooled long draw
Longer than 25 feet

18 Draft Equipment and System Configurations
Beer Line Bundle with Glycol

19 Storage and Carbonation
Keys to maintaining a keg’s carbonation CO2 percentage Applied pressure Keg temperature Beer’s particular carbonation level (pg 38 chart)

20 Dispense Goals Balanced draught system delivers clear-pouring beer
Rate of 2 ounces per second Rate of 8 seconds per pint Rate of 1 minute per gallon

21 Preparation to Pour Proper storage temperature (34-38 °F)
Above 38 °F can cause dispensing problems Pg 45 Chart 1 time to 38 °F Chart 2 time to increase temperature Linking in a series (pg 45) Saves time for high volume beers Remove Thomas valve

22 Draft Equipment and System Configurations
Kegs linked in a series

23 Serving Draft Beer Store between 34-38 °F Serve between 38-44 °F
Long draw glycol °F Balanced draw system (pressure = resistance) Normal flow rate of 2 ounces per second

24 Glassware cleaning Manual Cleaning 3 tub sink
Dedicated automatic glass washers Air dry glassware Do not dry or store on towels, rubber drain pad or other smooth surface Can impart odors due to slow drying Testing for clean glass Sheeting test Salt test Lacing test

25 Draft Equipment and System Configurations
Glassware

26 Draft Equipment and System Configurations
Glassware

27 Draft Equipment and System Configurations
Glassware

28 Glassware cleaning Glassware temperature Room temperature
Can cause high foaming for higher carbonated beers Chilled for lagers Dry glass well before chilling Water mist devices for pre-wetting Removes dust Allows for better aromatics

29 Pouring beer Hold glass at 45° angle, open faucet fully
Gradually tilt glass upright once beer has reached about halfway point of glass Pour beer straight down into the glass, working the glass to form a one-inch collar of foam Close faucet quickly to avoid wasteful overflow

30 Draught System Cleaning
ALWAYS wear proper Personal Protective Equipment (PPE)

31 Draught System Cleaning
Perform draught line cleaning at a minimum every 2 weeks Documentation posted clearly of schedule and performance Push beer from lines with cold water Clean lines with caustic solution (2%) for routine line cleaning Maintain temperature of °F for the duration of cleaning cycle Electric pump usage should circulate solution for 15 minutes at 2 gallons per minute Static or pressure pot, leave solution standing in lines no less than 20 minutes Disassemble, service and hand clean faucets; hand clean couplers After cleaning, flush lines with cold water until pH matches tap water and no visible debris

32 Draught System Cleaning
Quarterly Acid cleaning Disassemble, service and hand clean all FOB-stop devices (beer savers, foam detectors) Disassemble, service and hand clean all couplers Push beer or caustic cleaner from lines with cold water Clean lines with acid line cleaner mixed to manufacturers guidelines at °F Circulate or let stand, depending on use of pump or static cleaning Flush lines with cold water until pH matches tap water and no visible debris

33 Draft Equipment and System Configurations
Beer Line Cleaning Pump Beer Line Cleaning

34 Draught beer line replacement
Vinyl jumpers and vinyl direct draw lines should be replaced every year Long-draw trunk lines should be replaced: When the system is 10 years or older When flavor changes are imparted in a beer’s draught line from adjacent draught line When any line chronically induces flavor changes in beer

35 Troubleshooting Pages 61-65

36 QUESTIONS?


Download ppt "Draft Technologies RICK COX, B.B.A., BREWER."

Similar presentations


Ads by Google