Download presentation
Presentation is loading. Please wait.
Published byHarold Chandler Modified over 6 years ago
1
Steven Izzo January 24, 2008 Structures Tank/Engine Mounting
AAE 450 Spring 2008
2
Basic Design Against skin Ring structures Riveted Aluminum
AAE 450 Spring 2008 Structures
3
Estimated Costs Future Work $7/kg material $30/Pa required
Determine exact structure using codes. More exact manufacturing costs. AAE 450 Spring 2008 Structures
4
Material & Manufacturing Cost
Extruded material $/kg strength(Mpa)/$ strength/kg Al 6061-T6 4.41 54.72 241.32 Al 7075-T6 17.64 25.41 448.16 Ti-6Al-4V 93.59 9.36 875.63 aircraft steel(4130) 10.53 riveting, comparison of similar basic rivets and estimated labor costs 100 small, solid rivets steel $2.78 aluminum $2.82 titanium $5.02 AAE 450 Spring 2008
5
Sources Tsohas, J., “AAE 450 Spacecraft Design Spring 2008: Guest Lecture Space Launch Vehicle Design”, January 10, 2008 Setlak, Stanley J., Aerospace Structural Metals Handbook, Purdue University, Indiana, 2000. Klemans, B., “The Vanguard Satellite Launching Vehicle” The Martin Company, Engineering Report No , April 1960. Doyle, Jessii, “Initial Mounting Materials Research”, Janurary 17, 2008. McMaster Carr online catalog
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.