Lab #1: TimeWise Simulation Round 1
MG/IE 3400 – Production System Design
2
TimeWise Simulation Production Scheduler Material Handling Suppliers
Supervisor Tool Crib Attendant Industrial Engineers Warehouse Clerk Sales Representative Trucker Suppliers Kitting Face Assembly Back Assembly Clock Assembly Hand Assembly Inspection & Rework Customers
3
Schedule for Lab Activity Duration Details Introduction 30 Minutes
Process overview, details Draw numbers for roles Session 1 45 Minutes Game Play Discussion – observations, problems identify recorders Session 2 Discussion – additional observations Meet with lab group to begin assignment Session 3
4
Lab Assignment Letter to CEO, Sharon Johnson Letter should describe:
Performance of current process, variability, data quality Process characteristics that limit achievement of lean fundamentals Material and Information Flow Short paragraph describing your own experiences
5
Lean Thinking: Fundamentals
Understand Value What does the end customer want? Flow Make it simple Perfection Zero waste Pull Customer demand signals production FLOW requires that every step be: Capable - right every time (Six Sigma) Available (always ready to run) Adequate (with capacity to avoid bottlenecks (right sized tools) Source: Lean Thinking by Womack & Jones, 1996