1 Manual Downtime Entry

2 Add Machines Downtime reasons
3 Will be mainly used by CEG 1 For Break Downs the selection of the Reason is a must 2 Adding and removing Reasons is an easy process and will be done by plants

3 Add Machines Downtime reasons
1 For Break Downs the selection of the Equipment is a must 2 Adding and removing Equipment is an easy process and will be done by plants

4 Add Machines Downtime reasons
2 An UnitID needs to be entered by plant to select the right flavor for LIS 1 Adding and removing Flavors is an easy process and will be done by plants

5 Add Machines Downtime reasons
2 Unit ID is Read Only and the selection Is done automatically by PLC 1 Adding and Removing Primary Packs will be done by Control Eng. Group

6 Add Machines Downtime reasons
2 An UnitID needs to be entered by plant to select the right Secondary Pack for LIS 1 Adding and removing Secondary Pack is an easy process and will be done by plants

7 TPM Interface – Line #1 2 3 4 5 6 7 8 1 Click here for help
Select the Start and End Date / Time and click Get Events Select the type of event that you want to focus on 4 No action required for this section in case of Minor Stops 5 To be filled out by the EOD – Break Downs or Process Stop 6 To be filled out by the EOD – Break Downs or Process Stop Click here for help Comments are optional 7 8 This section to be filled out case By case 1 This screen is for TPM data entry and Is important to be filled out properly

8 Reports 1 2 No action required for this section in case of Minor Stops
When we select a Minor Stop this sections become invisible

9 Reports Select Equipment for Break Downs Process Stop

10 Reports Select Reasons for Break Downs Process Stop

11 Reports Select Failure Factor for Break Downs and Process Stop

12 Reports Select Failure Prevention case by case for Break Downs and
Process Stop

13 Reports Select Failure Prevention Status
case by case for Break Downs and Process Stop

14 Reports Select Re-Application Status case by case for Break Downs and
Process Stop

15 Reports Comments are optional

16 Reports 2 3 4 1 Select the Break Down event that will be converted
to a Process Stop 3 Click on this push button 4 After you click OK the Break Downs will be converted to Process Stop 1 This is an example on how to convert a Break Down to a Process Stop

17 Reports The Break Down was converted to Process Stop

18 Reports 2 1 The table should be empty if We can easily check
the plant personnel filled out the information for Break Downs We can easily check if the information for Break Downs was filled out