1
Open Tasks for PrimEx-II Run
DAQ system standard readout, partially unsolved: responsible: Dave/Pawel standard fast trigger electronics: totally open, responsible: (Dave/Itaru ??? New fast trigger addition, ongoing: responsible: Ashot/Mahbub New TDC readout at HYCAL area: ongoing, responsible: Dave/Mahbub ?? Integration of all trigger electronics: will start on 9/22, responsible: Itaru. On-line Service Programs: Not started yet (?) responsible: Pawel New timing electronics, crates, PC boards, discriminators, cables: ongoing: responsible Mahbub. A. Gasparian, PrimEx Coll. Meet
2
Open Tasks for PrimEx-II Run
Detector Survey: the target ladder, on going, responsible: Pawel/? task: to be able to position each target on beam during the beam time. PS: task: position the detectors according to Dan’s data. HYCAL; (a) task: to be able to position each detector cell on beam during the “snake” scan time with 2 mm accuracy. (b) on the stand: position to beam with 0.7 mm accuracy BPM: task position the detector on beam with 1 mm accuracy TAC: to be able to position it on beam with 3 mm accuracy Detectors: HyCal: on going, responsible: Ashot A. Gasparian, PrimEx Coll. Meet
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.