Presentation is loading. Please wait.

Presentation is loading. Please wait.

DISTRIBUTED GENERATION (DG) MODELING CRITERIA SWEDE 2016

Similar presentations


Presentation on theme: "DISTRIBUTED GENERATION (DG) MODELING CRITERIA SWEDE 2016"— Presentation transcript:

1 DISTRIBUTED GENERATION (DG) MODELING CRITERIA SWEDE 2016
April 26, 2016 Ron Shipman Oncor Asset Planning Distribution

2 Modeling Criteria DER Connections< 10 KW – No Service Study
11/12/2018 DER Connections< 10 KW – No Service Study Record of location - tracking tool DER Connections< 1MW – Service Study Record of location Transformer loading Proper Connectivity DER Connections> 1MW – Impact Study Customers Facilities Voltage/Loading Study Coordination Operation Transfer Trip Requirements

3 Type Distribution Studies
11/12/2018 ERS – up to 10 MW PV – 1.0 to 10 MW Pipeline Flow Generation Wind 2.0 MW Back-up generation up to 15 MW

4 DG RENEWABLES COUNT AND CAPACITY
4/26/2016

5 ONCOR INTERCONNECTED DG CAPACITY MW
4/26/2016

6 ONCOR DG INTERCONNECTION ACTIVITY
4/26/2016

7 QUESTIONS 4/26/2016

8 SAFETY Electrical Equipment and Placard Requirements
Oncor requires placards at the utility meter to help employees know there is a DG system on-site and where they can disconnect it if necessary PUC rule § requires customers furnish and install a disconnect device with visible break and capable of being locked in the open position Certified systems meet UL-1741 and the applicable provisions of IEEE1547 regarding safety and disconnect requirements For non-certified systems Oncor requires specific relaying elements for protection 4/26/2016


Download ppt "DISTRIBUTED GENERATION (DG) MODELING CRITERIA SWEDE 2016"

Similar presentations


Ads by Google