Presentation is loading. Please wait.

Presentation is loading. Please wait.

Tom’s Creek Foot-Bridge

Similar presentations


Presentation on theme: "Tom’s Creek Foot-Bridge"— Presentation transcript:

1 Tom’s Creek Foot-Bridge
Final Exercise Tom’s Creek Foot-Bridge

2 Instructions Scenario: Previous PO started PW but then rotated out
You have, scenario information, draft PW, FIRM, and photos As a class we will show photos next

3 Taken by applicant morning following storm near high water
Taken by applicant morning following storm near high water. April 2, 2003

4 Overview of bridge from downstream.

5 Marker found on bridge

6 Bridge pier (upstream view)
Bridge pier (upstream view). Applicant already has replaced stone in boxed area. Debris still in channel.

7 Washed out area downstream of bridge abutment.

8 Utilities on upstream side of bridge.

9 Assignment Determine appropriate mitigation measure
Obtain mitigation costs from instructors Revise PW as needed Complete Special Considerations Questions Prepare Hazard Mitigation Proposal.

10 Class Summary 406 Regulations & Policies General Principles
Hazards - Forces Involved - Mitigation Cost Effectiveness Other Considerations Document Preparation

11 Technical Feasibility
Other Considerations Cost-Effectiveness Technical Feasibility Eligible Project

12


Download ppt "Tom’s Creek Foot-Bridge"

Similar presentations


Ads by Google