Presentation is loading. Please wait.

Presentation is loading. Please wait.

ESB Networks AIP Programme. Business Design

Similar presentations


Presentation on theme: "ESB Networks AIP Programme. Business Design"— Presentation transcript:

1 ESB Networks AIP Programme. Business Design
ESB Networks AIP Programme Business Design Update to TAG, June 22nd 2006

2 ESB Networks AIP Programme :
Agenda 1. Design Documentation and where we are 2. Key Items to be aware of Data Model Data Definitions Market Messages 3. Plans to Progress the Design

3 ESB Networks AIP Programme : Design Documentation and where we are
ESB Networks draft Discussion Document 'Impact of AIP on ROI Retail Market’ 1st June Draft ver 0.1 7th June Special IGG 21st June Draft ver 0.2 Key Issues in Appendix 8 discussed at todays IGG Plans for progressing the Design with the IGG 29th June Responses from Market Participants due back 4th July SIMDRACS Co-Ordinator clarifications/decisions 6th July Draft ver 0.3 13th July Special IGG - looking to come to conclusions on issues and to arrive at agreement on the design, apart from outstanding items.

4 ESB Networks AIP Programme :
Agenda 1. Design Documentation and where we are 2. Key Items to be aware of Data Model Data Definitions Market Messages - 2 Options 3. Plans to Progress the Design

5 ESB Networks AIP Programme : Data Model
Issue 3: Requirements of Meter Data providers to accommodate multiple Supplier/SSACs for a single Supplier Unit to be clarified by CER/SIMDRACS.

6 ESB Networks AIP Programme : HLD: As-Is Data Model for Data Aggregation

7 ESB Networks AIP Programme : HLD : To-Be Data Model for Data Aggregation with Single Supplier Unit

8 Networks AIP Programme : HLD : To-Be Data Model for Data Aggregation with Multiple Supplier Units
Supplier ID Data Supplier Unit Supplier Unit SSAC SSAC SSAC SSAC Green Brown Green Brown QH NQH QH NQH QH NQH QH NQH Initial Aggregation Messages 525 521 525 521 QH NQH QH NQH to Suppliers Impor t Import Import Import & NQH also to TSO Initial Aggregation 520 526 data for SMO and SMO Supplier Supplier Suppliers Unit Data Unit Data copy to Suppliers

9 ESB Networks AIP Programme : Issues
Requirements of Meter Data providers to accommodate multiple Supplier/SSACs for a single Supplier Unit to be clarified by CER/SIMDRACS. Option 1 Establish a one to one relationship between Supplier ID and Supplier Unit and use this mapping for summing by SSAC per Supplier Unit and communication with the SMO. Retail market MMs remain the same. Option 2 Implement a one to many relationship between Supplier ID and Supplier Unit Pros No material change to the data structure for aggregation Significantly minimises development effort and complexity for Market Participants Easing of transitional arrangements for dual operation over 13 month ‘cutover’ Cons New data mapping for ESB Networks Exceptional handling for Trading Site Supplier Unit - mapped per MPRN Pros Allows multiple Supplier Units per Supplier Cons Significant effort to implement for ESB Networks Inclusion of Supplier Unit in 12 MMs (follows) New market processes for Change of Supplier Unit Changes to internal ESB Networks processing to handle Supply Unit rather than Supplier/SSAC

10 ESB Networks AIP Programme : Option 2
Messages Involved: Change of SSAC Rejection 115R Change of SSAC Confirmation 115 Change of Supplier Confirmation 105 Change of Supplier Registration Rejection 102R Change of Supplier Provisional Acceptance 102P Change of Supplier – Default Registration Notification 102N Change of Supply Registration Acceptance 102 New Registration Rejection 101R New Connection Provisional Acceptance 101P New Connection Registration Acceptance 101 Change of SSAC request (changes to “Change of Supplier Unit / SSAC request”) 015 Registration request 010 ESB Networks Impact = Significant Effort Additionally Required Functionality A new data item must be defined to store the Supplier Unit identifier All messages where the SSAC is currently included (except current 5xx messages) will now also need to include the Supplier Unit identifier. New rules and processing surrounding Changes to Supplier Unit must be developed. Changes to internal SAP processing to handle Supply Unit rather than Supplier/SSAC

11 ESB Networks AIP Programme :
Agenda 1. Design Documentation and where we are 2. Key Items to be aware of Data Model Data Definitions Market Messages - 2 Options 3. Plans to Progress the Design

12 ESB Networks AIP Programme : Issue 4 : Data Definitions

13 ESB Networks AIP Programme :
Agenda 1. Design Documentation and where we are 2. Key Items to be aware of Data Model Data Definitions Market Messages - 2 Options 3. Plans to Progress the Design

14 ESB Networks AIP Programme : Aggregation Messages Example : Initial Aggregation …..Option 1
D A A,C Summated per registered Supplier unit Summated per registered Supplier unit B,C, B,D [A] Messages to be similar to existing 501,505,504 [B] Messages to be in SMO format [C] New Messages to support Non-Participant Generators [D] New Messages for SMO/ New Message Format/ QH+NQH,30 minutes,MWh,Long/Short Day B,D

15 ESB Networks AIP Programme : Aggregation Messages Example : Initial Aggregation …..Option 2

16 ESB Networks AIP Programme : Issue 28 : Market Messages
Composite Aggregations Messages to be provided to Market Participants instead of Individual messages per aggregation process Option 2 ESB Networks would send 8 Market Messages to each Market Participant per settlement day. There would be 2 formats, each would have 4 messages per settlement day. 5xx MM based upon the 5x0 data to SMO 5yy MM with lower level detail Each MM would contain within it an indicator as to which Aggregation it relates to. Option 1 ESB Networks would send separate market messages as per the earlier slide. Each MM number would indicate which Aggregation it relates to. Pros Analysis confirms MM size within hub ‘ ‘bandwidth’ Ease of identification and search Allows for specific market message to be suppressed should a MP not require it Cons Overhead to maintain multiple MMs. Pros Minimises maintenance overhead for Market Participants Cons Larger MM size for the Hub - 5yy message Could cause bottlenecks in development and maintenance somewhat more effort required to identify and search for data

17 ESB Networks AIP Programme :
Agenda 1. Design Documentation and where we are 2. Key Items to be aware of Data Model Data Definitions Market Messages - 2 Options 3. Plans to Progress the Design

18 ESB Networks AIP Programme : 3. Plans to progress the Design
1st June Draft ver 0.1 7th June Special IGG 21st June Draft ver 0.2 22nd June IGG today to discuss Appendix 8 - Key Issues 29th June Responses from Market Participants due back 4th July SIMDRACS Co-Ordinator clarifications/decisions 6th July Draft ver 0.3 13th July Special IGG - looking to come to conclusions on issues and to arrive at agreement on the design, apart from outstanding items.

19 ESB Networks AIP Programme : 3. Plans to progress the Design
Contacts Feedback/Queries marked for Attention of ESB Networks AIP Programme & sent to Theresa ext 47442


Download ppt "ESB Networks AIP Programme. Business Design"

Similar presentations


Ads by Google