1 F-16 RLCRS Program Update
Rik Crowther Senior Engineer OO-ALC/EN SME: Rik Crowther DSN: DISTRIBUTION A. Approved for public release: Distribution Unlimited. HAFB ref# _AMXG_041 Built Right...Ready to Fight

2 Overview Plastic Media Blast RLCRS process data Benefits and issues
Planned Improvements Future Implementations

3 Built Right...Ready to Fight
PMB Process 2000 lbs. of haz. waste per AC Multiple operators in PPE 10-14 Flow days 500+ man hrs. (prep, blast, de-prep, pre & sand for paint) Reduces fatigue life of OML skins Built Right...Ready to Fight

4 RLCRS 10-12 lbs. of waste 40-50% man hrs. reduction
30% reduction in flow days Removes worker from PMB environment No impact to Airworthiness

5 Built Right...Ready to Fight
Process Data Summary Built Right...Ready to Fight

6 RLCRS Average Process Hours
RLCRS prep & operations: 139 hours RLCRS flow time: 67 hours RLCRS flow days w/2 shifts: 4 Sanding: 138 hours Total Process: 278 hours Total Process flow: 7 days

7 RLCRS vs. PMB Reductions: Total Process hrs: 200-300 Flow days: 2-4
Hazardous Waste: 2000 lbs.

8 The “Not So Great” Reductions: Increase in sanding hours
40-80 additional hours of sanding Mostly bottom of AC Stress/Strain complaints from AC painters Increase exposure to sanding dust

9 Built Right...Ready to Fight
RLCRS Improvements EZP building RLCRS for Testing: Optimization for multiple AC Variable coating stack ups Dem/val future system upgrades Planned Upgrades for RLCRS: Reduce robot time 15-20% (30-50 hrs) Evaluating robotic assist sanding technologies Evaluating improved vacuum systems for sanding equipment Built Right...Ready to Fight

10 Built Right...Ready to Fight
RLCRS Future Systems Repurpose C-130 system for increased F-16 workload at OO-ALC (F-35, F-22, A-10, Off air frame components) B-1 program AMARG program Built Right...Ready to Fight

11 Built Right...Ready to Fight
Questions? Built Right...Ready to Fight

12 RLCRS De-painted AC

13 RLCRS De-painted AC

14 RLCRS De-painted AC