Download presentation
Presentation is loading. Please wait.
1
Alabama Tools Seminars
February 8 – Decatur February 13 – Pelham February 15 – Montgomery February 20 – Mobile New EPA UST Regulations: What You Must Have Done by October 13, 2018 adem.alabama.gov
2
New Regulations already in effect
ADEM revised regulations became effective December 8, 2017 Compatibility demonstration requirements and ball float ban already in effect adem.alabama.gov
3
What Testing is Due by October 13, 2018?
Overfill prevention equipment inspections Containment sump testing (if used for interstitial monitoring) 30 day and annual walkthrough inspections Release detection equipment testing Release detection for emergency power generator USTs adem.alabama.gov
4
Reminder – Compatibility Requirements
Beginning December 6, 2017, for any UST storing greater than 10% ethanol or 20% biodiesel, owners must notify the department and demonstrate the compatibility of their systems with the fuels being stored. Records must be kept for as long as the UST is storing that fuel adem.alabama.gov
5
Reminder – Ban on Ball Float Valves
December 8, 2017, ball float valves may not be used to meet over fill requirements on new installations Current ball float valves may remain in use, but must pass overfill inspection If a ball float fails, it may be repaired If it cannot be repaired, it must be replaced by an automatic shutoff device or high level alarm adem.alabama.gov
6
What Constitutes a Repair?
If the ball float valve can be returned to operation with its original parts, it is an allowable repair If new parts are needed (e.g. new cage, new ball), it is not an allowable repair and the ball float must be replaced by a flapper valve or high level alarm adem.alabama.gov
7
Replacing Ball Floats According to PEI RP , a ball float valve set to activate at 90% will interfere with a flapper valve set to activate at 95% When replacing a ball float valve, remove the entire assembly Ball floats set to 95% will not interfere with operation of a flapper calve set to 95% adem.alabama.gov
8
New Requirement Annual Release Detection Equipment Tests
Automatic tank gauge systems and other controllers Probes and sensors Automatic line leak detectors (mlld & elld) Vacuum pumps and pressure gauges Hand held electronic sampling equipment associated with vapor and groundwater monitoring Keep records three years adem.alabama.gov
9
New Requirement Three Year Inspections and Testing
Overfill prevention equipment must be inspected every three years Containment sumps used for interstitial monitoring must be tested for integrity every three years Low level test method developed by ADEM Keep records three years adem.alabama.gov
10
Walkthrough Inspections
Every 30 days Check spill prevention equipment and fill pipe Check release detection equipment to ensure proper operation Check impressed current cathodic protection system rectifier Annually Check containment sumps Check hand held release detection equipment First inspection due by October 13, 2018 adem.alabama.gov
11
Emergency Generator Tanks
New federal regs now cover EPG tanks EPG tanks currently in use must have leak detection by October 13, 2018 New EPG tanks installed on or after December 8, 2017 must have leak detection at installation Leak detection systems on EPG tanks will NOT be required to shut off or restrict flow, may use audio or visual alarm alone adem.alabama.gov
12
Recap - Implementation Timeframes
On December 8, 2017: Ban on vent flow restrictor overfill device for new USTs and upon replacement Testing after repairs Overfill device (Inspection) Secondary containment equipment used for interstitial monitoring Compatibility demonstration adem.alabama.gov
13
Recap - Implementation Timeframes
On October 13, 2018: Overfill prevention equipment inspections Containment sump testing (if used for interstitial monitoring) 30 day and annual walkthrough inspections Release detection equipment testing Release detection for emergency power generator USTs adem.alabama.gov
15
Inspections and Testing Resources
ADEM O&M Manual (currently under revision) PEI RP900 - Recommended Practices for the Inspection and Maintenance of UST Systems PEI RP 1200 – Recommended Practices for the Testing and Verification of Spill, Overfill, Leak Detection and Secondary Containment Equipment at UST Facilities adem.alabama.gov
16
Contact Information Sonja Massey David Batchelor Latoya Hall adem.alabama.gov
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.