Magdalena Kowalska, CERN PH-SME-IS
ISOLDE scientific coordinator’s report ISCC meeting, February 2, 2011 Running statistics 2010 Status of experiments and ISOLDE hall Safety files on fixed installations News on ISOLDE web page Magdalena Kowalska, CERN PH-SME-IS
2
ISOLDE running period 2010 Requested shifts: 667 in total
~29 weeks for physics vs 31 weeks in 2009 Requested shifts: 667 in total 627.5 for 50 experiments GPS HRS Scheduled shifts (~73%): 480 in total 443 for 41 experiments REX-ISOLDE: 332 shifts requested 160 shifts scheduled (~37%)
3
ISOLDE running period 2010 ISOLDE delivered 350 RIB shifts (like in 2009) 265 (76%) for INTC experiments (vs 82% in 2009) 85 (24%) other (vs 18% in 2009) Standard target check + TISD + REX-MD Coordinators reserve: debugging, recovery, tests, LOIs 41 research projects (IS experiments) – 7 with no beam (vs 6 in 2009) 4 LOIs Integrated # protons 7.7e19 (vs 6.7e19 in 2009) Running for 203 days (vs 223 in 2009) More protons on GPS (4.0e19), but equal number of shifts (ca. 175) 56% of possible RIB shifts used (1.69 shifts/day) (55% in 2006 61% in 2007 56% in 2008 52% in 2009)
4
Shift distribution Remaining shifts:
5
Shift distribution
6
Shift distribution
7
Resources: targets 2010 Actinide targets 244 shifts (out of 350) [72%]
12 new units + 2 old (one not used) In total 25 targets 21 new units 1 not used
8
Resources: RILIS 2010 158.5 total RIB shifts (155.5 in 2009)
151 shifts for INTC experiments ~2000 hours for online work includes setup, yield checks, etc. >2100 hours total running time (incl. off-line tests) 20 IS experiments (20 in 2009) Beams: Mg, Cu, Ga, Tl, Be, Pb, Mn, Au, Be, Zn, Ag, At (all with Nd:YAG pump lasers and new dye lasers)
9
Resources: RILIS 2010
10
Resources: REX 2010 100 shifts
11
Latest Accelerator schedule 2011
ISOLDE dates (as in Nov.) protons to ISOLDE April 25 physics start ISOLDE May 2 protons stop November 20 (i.e. 29 weeks for physics vs 29.5 in 2010) Protons: December Research Board approves 34% proton pulses for ISOLDE nTOF starts in March: ISOLDE can get 1 proton pulse more during nights => ISOLDE is guaranteed 34-37% proton pulses (ca.1.5uA)
12
Beta-NMR System for manipulating foils and connected parts machined in Rehovot (Ch. Sotty went there last week to see what needs changing); will be sent to CERN next week Tests of scintillator efficiency planned for next week (when G. Georgiev comes to CERN) Machining of remaining parts and installation of chamber: spring 2011 Running period 2011: system should be ready for 1st online tests PhD students are presently analysing Miniball data from 2010
13
WITCH Additional shielding for REX mass separator installed and tested in December: magnet at nominal field: losses when scaling masses Magnet at ca 50% of the field: full mass scaling possible after re-steering the beam Difficult access to REX diagnostics => REX operation and scaling possible after finding new settings for each mass range; details to be discussed with Fredrik and Didier Physics run on 35Ar scheduled for week 46 had to be cancelled: WITCH trap damage due to over-baking
14
ISOLTRAP decay-spectroscopy station
commissioning beamtime in Sep 2009 first real online run in Nov 2010, assisting mass measurements: determination of excitation energy and assignment of state to 194Tl isomer
15
Cleanup Offline lab (bldg 275) cleanup: December
ISOLDE extension cleanup: next week
16
Safety files for fixed installations
Required by the HSE unit for all CERN experiments; PH-DSO Christopher Griggs as our contact: WITCH and CRIS as test cases; files being finalised Files in preparation by local responsibles until end of February Feedback and checks of conformity (CE) during the year Necessary changes implemented this year Full safety file (most probably) ready for 2012 running period Visiting installations: presently “safety table” in INTC proposals; a reduced safety file template in preparation PH-DSO is very happy about our progress: “ISOLDE leads the way is matters of safety at CERN”
17
News on the ISOLDE web page
18
News on the ISOLDE web page
List of ISOLDE publications 2009-now: Science&Events -> Publications -> ISOLDE Publications -> Publications Found: 73 publications 12 Phys. Rev. Lett.