Presentation is loading. Please wait.

Presentation is loading. Please wait.

EC08 OGC Pilot Bidder’s Conference

Similar presentations


Presentation on theme: "EC08 OGC Pilot Bidder’s Conference"— Presentation transcript:

1 EC08 OGC Pilot Bidder’s Conference
January 16, 2008 Sam A. Bacharach OGC Initiative Manager © OGC, All Rights Reserved

2 Questions from participants Summary and Wrap up
Agenda Introductions Pilot Status Selection Schedule Overall Schedule Questions from participants Summary and Wrap up Copyright 2008, OGC

3 Introductions Sam Bacharach, OGC Staff, Initiative Manager Tom Merkle, Lockheed Martin, Architect John Davidson, Image Matters, IP Team Tim Eveleigh, Image Matters, IP Team I assume you have already read the RFQ/CFP package, so this is a question and answer session: You ask, we answer Copyright 2008, OGC

4 RFQ/CFP Released 4 January 2008
Pilot Status RFQ/CFP Released 4 January 2008 Two questions received via and answered with Clarifications posted at: Responses still due 24 January and we have no time in the schedule to slip it. You all have the same time handicap and we will take that into account during the evaluations Copyright 2008, OGC

5 Selection Schedule 4 January RFQ/CFP Released
16 January Bidder’s Conference 24 January Proposal Deadline 29 January Decision TEM #1 Evaluations presented to sponsor Sponsor guidance, questions accepted 31 January Decision TEM #2 Final evaluations presented to sponsor Sponsor selects participants, provides cost sharing guidance 1 Feb – 25 Feb OGC negotiates with sponsor selectees Participants sign contract, or at least IPR statement 26 Feb – 28 Feb Kickoff Site TBD in the DC area No participation without signed IPR statement Copyright 2008, OGC

6 Overall Schedule Date OGC Pilot EC08 29 Feb Pilot Begins 31 Mar
Demonstration Selection by sponsor (to Spiral 2) 30 Apr 30 May Demonstration Selection by sponsor (to Spiral 3) 6 Jun 23-27 Jun Set up at China Lake, Reston III, other locations Week Zero 7-11 Jul Technical Assessment Week 1 14-18 Jul Operational Assessment Week 2 21-25 Jul Week 3 28- 1 Aug Operational Demonstration Week 4 29 Aug Final Reports Due 28Feb ‘09 OGC Network services no longer obligated (Spiral May, Spiral June) Copyright 2008, OGC

7 Questions What are your questions? Online participants are first
In person participants are second Copyright 2008, OGC

8 Summary and Wrap Up We need your help in responding in a timely and succinct manner: Going over the page limits will not help your score Using acronyms and program names without explanation won’t either Please send your future questions to We will be posting questions, answers and comments from this meeting to the Clarifications document found at: Thank you for coming and dialing in Copyright 2008, OGC


Download ppt "EC08 OGC Pilot Bidder’s Conference"

Similar presentations


Ads by Google