Download presentation
Presentation is loading. Please wait.
1
Streamlining for Growth Funding
Function Layout Plans Luke Connell 19 April 2018
2
Background Cardinia Shire Council is one of the smallest growth areas in metropolitan Melbourne.
3
Background Development rates have increased by approximately 25% in the last 3 years. All areas involved in growth area planning started to come under pressure. Council resources in Engineering are not specific to growth areas. Cardinia’s growth area is approximately 15% of the whole municipality.
4
Pressure on Functional Layout Plan (FLP) Process
Average turn around time for a response for FLPs was 30 days. 3 staff assessing FLPs within the organisation, but growth areas was only part of their job description.
5
Funding for Functional Layouts Plans
Cardinia Shire was successful in receiving funding for a resource to assist in the assessment of functional layout plans. Contracted an engineer from Council’s professional services list. Approximately 2-3 days work a week. Turnaround times reduced from 30 days to 20 days.
6
Outcomes Positive feedback from development community.
More time for staff to focus on core job requirements. Happy staff
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.