Download presentation
Presentation is loading. Please wait.
1
Power Sector Reform in Asia
David Parish
2
My Involvement in Asian Power
India Bangladesh Cambodia Pakistan Sri Lanka Philippines Vietnam Plus review of ADB sector policy
3
Asian power sector around 1990
Universal public ownership Extensive political intervention in all aspects of activity Integrated utilities High levels of losses and poor collection performance Supply interruptions Major investment needs Significant subsidies to the sector from taxpayers
4
Two Caveats Significant variations between countries in speed and enthusiasm for reform Vietnam: late starter but keen implementer Bangladesh: early starter but slow progress Even bigger variations within countries, especially India but also Pakistan and Bangladesh
5
The standard model for reform
Unbundling (gencos, transco and discos) Independent Regulation Private sector involvement
6
The standard model for reform
Unbundling (gencos, transco and discos) Independent Regulation Private sector involvement Moves towards competitive markets Operational Improvements Financial solvency Tariff reform
7
Unbundling Some progress almost everywhere
India: centrally mandated requirement for states but mixed progress Philippines: largely complete Pakistan: structure in place but resistance within WAPDA Bangladesh: work in progress and slow Vietnam: work in progress but appear committed Sri Lanka: reform stalled
8
Unbundling Creates framework for competition and private participation
Accompanied by corporatization and creation of new companies Creates new senior positions, especially in discos Significantly improved results, eg in India, Bangladesh and Vietnam Reduced losses (technical and non-technical) and better revenue collection
9
Independent Regulation
Slow but sometimes significant progress India: central regulator and in most states but effectiveness varies Pakistan: good regulator but government still controls tariffs Bangladesh: extreme delays in both legislation and establishment Philippines: interesting model but some political interference Vietnam: just starting Sri Lanka: stalled
10
Independent Regulation
India best example to date (regulatory Raj replaces licence Raj) Areas such as Delhi and Gujarat have effective regulation Western regulatory models do not cater for situations with large supply shortfalls Continuing political interference almost everywhere
11
Independent Regulation
Regulator often sees role as keeping prices down at all costs Commitment to cross subsidy Unwillingness to respond to fuel price increases Not met objectives in any country yet Negligible progress in tariff reform But it was always going to be a challenge
12
Private Sector - Generation
Many IPPs contracted in mid to late 1990s from international companies Some dubious investments, eg in Pakistan and Philippines and Enron in India State solvency at risk in Pakistan and Philippines Excellent projects in Bangladesh and Vietnam International investors have less interest since 2000
13
Private Sector - Generation
Growing local capacity, especially in India Some privatization in Philippines, but some failures as well High initial costs but efficient plant operations Projects require government guarantees All projects to date have been baseload plants Very difficult to promote projects at the moment
14
Private Sector – Transmission and Distribution
Private transmission project in India Sale of KESC in Pakistan Share issue by distribution and transmission companies in Bangladesh Cooperatives in Philippines and Bangladesh Limited conclusions
15
Competitive Markets Countries generally adopt single buyer model in first stage Open access continues to be an objective, not a reality Continuing high levels of captive plant Unwillingness to differentiate retail tariffs Cross subsidy in retail tariffs Question mark over viability of power investments without demand guarantees
16
Conclusions: Is it working?
Reform remains a work in progress Slow progress but not surprising with so much at stake. Ambitious hopes of structure like telecoms industry is dead Very little regression back to old models Unbundling has generally been successful
17
Conclusions: Is it working?
Regulation has a long way to go Private sector has mixed results Competition only in generation and even there is limited Financial results still poor Tariffs unreformed and a growing issue with system peak
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.