Download presentation
Presentation is loading. Please wait.
Published byRiya Jacoway Modified over 10 years ago
1
Introduction to building Estimating in South Australia 1
2
Architectural Floor plan 2
3
Architectural plan building details 3
4
Architectural elevations 4
5
Truss Layout via Pryda software 5
6
Truss Report via Pryda software 6
7
Conventional manual layout with trusses 7
8
Production Truss plan used for manufacture -Critical measurements shown Council Truss plans -Loads and engineering shown Truss T4 8
9
Truss T10 9
10
How the plans look on site 10
11
11
12
12
13
Truss to conventional hip end Truss T 4 13
14
Truss to conventional hip end (close up) Truss T4 14
15
Truss to conventional hip end (Halfway point) Truss T10 15
16
Truss T10 Truss to conventional hip end (side view truss T10 16
17
Steel Facia Hip end & Steel Facia 17
18
Valley boards 18
19
Panel N Pryda software wall layout 19
20
Wall frame panel NEngineering for the lintel, for the size Pryda software Engineering- Based on wind speed and loading 20
21
Wind speed is indicated on the architectural drawings Residential categories are: 28 Km/h (N1) 33 Km/h (N2) 41 Km/h (N3) The wind speed determines both bracing and beam loading for the building Strip bracing OS panel bracing 21
22
OS Bracing Lintel 22
23
Timber take-off list Computer Manual 23
24
The Building process on site 24
25
Strip bracing Top plate bracing Bottom plate Truss tie down 25
26
Finished valley, Facia and gutters Underside of eaves, facia and gutter Brick work Tied to frame 26
27
Fully trussed roof Non-load bearing internal wall 27
28
Typical multi dwelling Multi storey site -Scaffolding 28
29
Floor trusses 2 Storey Bracing & Tie downs Plumbing to be taken into consideration with floor trusses 29
30
Party fire walls between buildings Fire check 13 & 16mm Shaft liner 25mm 30
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.