Presentation is loading. Please wait.

Presentation is loading. Please wait.

Reuse and Wastewater Disposal

Similar presentations


Presentation on theme: "Reuse and Wastewater Disposal"— Presentation transcript:

1 Reuse and Wastewater Disposal

2 Potable Reuse Pilots in Florida
Clearwater Tampa West Palm Beach Sunrise Plantation Davie Hollywood Pembroke Pines Pompano Beach Daytona Beach Altamonte Springs JEA

3 Aquifer Recharge Opportunities: Karst features in rivers
Recharge through sinkholes Wetland rehydration Recharge wells Rapid infiltration basins Saltwater barriers

4 Floridan Aquifer Groundwater Conditions
August 2017, Districtwide Median: 43%

5 City of Ocala Wetland Groundwater Recharge Park
Water supply and water quality benefits: Recharge: up to 5 mgd Load reduction (Lbs/Yr): 29,000 Total Nitrogen 30,000 Total Phosphorous

6 District Cost Share Program Reuse and Aquifer Recharge
Project Type Total Construction* Cooperator Cost Share* WMD Cost Share* Water Saved or Made Available (mgd) Reuse $103.4 $62.3 $41.1 91 Aquifer Recharge $8.8 $6.6 $2.2 5 - 10 DPR $4.7 $2.3 $2.4 N/A Totals $116.9 $71.2 $45.7 Note: * Costs Shown in Million Dollars

7 Varied Rainfall Conditions

8


Download ppt "Reuse and Wastewater Disposal"

Similar presentations


Ads by Google