Download presentation
Presentation is loading. Please wait.
Published byHadi Hermanto Modified over 6 years ago
1
Jackson Ntw You have just taken over as plant manager for K-LOG manufacturing which makes playground equipment. There are four primary stations and parts may flow between stations but because of job shop requirements may enter a station at any particular point. In addition, there is a loss of approximately 10% at each station (round up or down to nearest whole). Past data indicates flow of parts to the various stations. . You are to calculate the arrival rate to each station and calculate performance metrics L and W for the fabrication station.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.