Investment Work Package I.2 H2 to Transportation Fuels:

Similar presentations


Presentation on theme: "Investment Work Package I.2 H2 to Transportation Fuels:"— Presentation transcript:

1 Investment Work Package I.2 H2 to Transportation Fuels:
Solar-fueled H2 refueling station (HRS) Stornoway, June 26./27.st 2018

2 Agenda WP Progress WP Adjusted Timeline Design Results
Procurement Process Steps Ahead

3 WP I.2 Progress 2018 2019 2020 Pre-Design Risk Analysis Selection
Status June 2018 2018 Risk Analysis Selection refined-Design Procurement Contracts Technical Review Risk Mitigation Permits Civil work Installation 2019 Installation Commissioning Monitoring Analysis Installation Analysis Replication 2020 SWOT

4 Authorities engineering
Timeline WP I.2 Pre-Design Procurement Risk assessment Authorities engineering Civil work Plant construction SAT Operation

5 Main Distribution Panel
WPI.2.1 Design Results Dispenser 700 barg 6 kg H2 600 km LT:30 min PV Array DC/AC 35 kWp Electrical Grid 70 KVA/3Ph/400V Main Distribution Panel Electrolyzer 5,0 Nm3 H2/hr @32 barg Compressor Bank Multi-Stage´Compressor Multi Stage Storage (Seasonal and Loading) Storage* 55 kg H2 (Seasonal & Loading) Water Supply 30 barg

6 Fig1.H2 Refueling Station Location (Source Google Maps)
WP I.2.1 Design Results PV Array Fig1.H2 Refueling Station Location (Source Google Maps) Station (Incl. security clearance) IZES GmbH SCOPE Location: Innovation Campus Saar Saarbrücken, Germany Semi-Autonomous Operation (PV Array) 700 barg loading Seasonal and Loading Storage (1 Vehicle)* Peak Production Expansion Water Treatment Unit Containerized Solution Monitoring and Plant Management System

7 WP Design Results

8 WP I.2.1. Design Results Design: Refining
Hydrogen Quality adjusted to SAE2719, Cost optimized Compressing conditions simulated and suggestions for energetic optimization Filling conditions modified, according to vehicle manufacturers claim Cost optimized

9 WP I.2.1 Risk and Mitigation
Explosion Protection (reject zones) Fire Protection (fire loads) Respect securtiy distances to buildings and storages (3 m Horizontal, Vertical Vent Clearance) Noise Levels: <65 dBA in operation >45 dBA idle Third Party certified Permit Process Route: Supplier & IZES => ZÜS & TÜV (Comissioner) => Construction and Operation Authorities

10 WP I.2.2 Procurement RFO as a basis for Suppliers (4 Offers Received)
Turn-Key Solution, Self-Contained, Outdoor Solution. Components: Electrolyzer: Initially 5 Nm3/hr Water Treatment Plant Gas Conditioning Equipment: 99,999% of H2 Compression Bank: Sufficient to load bars Storage Tank: 50 Kg- Minimum Overall (Flexible for different pressure steps) Dispenser: Sufficient to load bars. LT: 30 mins Facility Control System: Plant Slave of the PV Array/Normal Mode Warranty: running hours dependant *The plant will not be fully fit for a commercial application! (Modelling should resolve this!)

11

12 Thanks! IZES gGmbH Contact Points Bodo Groß, gross@izes.de
Wulf Clemens