Presentation is loading. Please wait.

Presentation is loading. Please wait.

Next steps, organisation, discussion

Similar presentations


Presentation on theme: "Next steps, organisation, discussion"— Presentation transcript:

1 Next steps, organisation, discussion
The IDS initiative Strategic review conclusions Neutrino Factory roadmap Discussion: Next steps Organisation

2 The IDS initiative Must remember to mention: Detector R&D and theorist/phenomenologist/experimenter network

3 ISS baselines 100 (50) kT magnetised iron detector Two baselines:
3000 – 5000 km 7000 – 8000 km Store μ+ & μ- simultaneously 1021 muon decays/yr Eμ ~ 25 GeV

4 NuFact06 mandate

5

6 Strategic review conclusions
Improved knowledge of θ13 Double CHOOZ, T2K, NOνA, … Decision point 2012 High-sensitivity ν-oscillation facility second half of next decade J-PARC, SNS, … Scientific imperative: Neutrino Factory must be an option

7

8 Timescale: overview IDS initiative

9 IDS initiative: status
Ad hoc steering group:

10 Components: SνM … and BSνM Source for muon physics
Detector for muon physics DIS SνM … and BSνM Muon physics

11 IDS initiative: status
AhSG: 4 meetings: 08Dec06, 05Jan07 09Feb07, 21Feb07 IDS www page: IDS mailing lists set up Morphed from ISS mailing lists Next meetings: 19-21 February, CERN: ISS report editorial meeting 29-30 March, CERN: ISSIDS meeting

12 AhSG: o/p Goal of NF IDS: Neutrino Factory RDR (~2012):
Engineering designs for most components Neutrino Factory IDR (~2010): Marks transition from: Concept development/R&D with engineering support … to … Significant engineering effort with concept-development/R&D programmes to mitigate risks

13 Discussion: Next steps … Organisation …


Download ppt "Next steps, organisation, discussion"

Similar presentations


Ads by Google