Mathews Bridge. Mathews History Open to Traffic: April 15, 1953 Cost: $11 Million Fully Painted: 1982 Paint Touch-up: 1995, 2002, 2007 Steel Grating Replaced.

Similar presentations


Presentation on theme: "Mathews Bridge. Mathews History Open to Traffic: April 15, 1953 Cost: $11 Million Fully Painted: 1982 Paint Touch-up: 1995, 2002, 2007 Steel Grating Replaced."— Presentation transcript:

1 Mathews Bridge

2 Mathews History Open to Traffic: April 15, 1953 Cost: $11 Million Fully Painted: 1982 Paint Touch-up: 1995, 2002, 2007 Steel Grating Replaced 2007, $12.9 Million Paint & Structural Repair 2011, $22.7 Million

3 LOGISTICS Vertical Clearance: 149.5 Vertical, Water to Low Member =150 Vertical, Deck to Low Member = 21 Deck to Top of High Point on Truss = 100 Main Channel Width = 700 Water Depths = 16 to 38 Tides = 2

4 Bridge Connections: Bolts and Rivets

5 .

6 ..6

7

8 Eastbound Traffic: Union Street to the Hart Bridge, Atlantic Blvd to University/Cesery Blvd to Arlington Expressway Westbound Traffic: Arlington Expressway to Cesery Blvd/University Blvd to the Hart Bridge to State Street to downtown Jacksonville Detour Routes

9 DETOUR ROUTES

10 FDOT Public Information Officer Mike Goldman (904) 360-5457


Download ppt "Mathews Bridge. Mathews History Open to Traffic: April 15, 1953 Cost: $11 Million Fully Painted: 1982 Paint Touch-up: 1995, 2002, 2007 Steel Grating Replaced."