Download presentation
Presentation is loading. Please wait.
Published byLarissa Seeds Modified over 10 years ago
1
Mathews Bridge
2
Mathews History Open to Traffic: April 15, 1953 Cost: $11 Million Fully Painted: 1982 Paint Touch-up: 1995, 2002, 2007 Steel Grating Replaced 2007, $12.9 Million Paint & Structural Repair 2011, $22.7 Million
3
LOGISTICS Vertical Clearance: 149.5 Vertical, Water to Low Member =150 Vertical, Deck to Low Member = 21 Deck to Top of High Point on Truss = 100 Main Channel Width = 700 Water Depths = 16 to 38 Tides = 2
4
Bridge Connections: Bolts and Rivets
5
.
6
..6
8
Eastbound Traffic: Union Street to the Hart Bridge, Atlantic Blvd to University/Cesery Blvd to Arlington Expressway Westbound Traffic: Arlington Expressway to Cesery Blvd/University Blvd to the Hart Bridge to State Street to downtown Jacksonville Detour Routes
9
DETOUR ROUTES
10
FDOT Public Information Officer Mike Goldman (904) 360-5457
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.