UCSB Testing Status Anthony Affolder
(for the UCSB module testing group) L3 Testing Meeting March 7, 2003 UCSB Status-Anthony Affolder
2
Testing Facilities Readiness
Clean room adjacent to production area Room layout finished Currently in high bay with intentionally same layout Missing only hybrid thermal cycling test Clean room will be finished in April Storage cabinet with dry air flow in place for testing phase Long term module storage cabinets under construction at KSU L3 Testing Meeting March 7, 2003 UCSB Status-Anthony Affolder
3
UCSB Status-Anthony Affolder
Current UCSB ARC Setup 3 ARC Controller + 5 new ARC FE 1 Hybrid testing (2 Hybrid clamshells) 2 Module testing (Module clamshell) 2 LED systems DEPP HV supply Missing hybrid-to-utri adapters to fully use capacity Hybrid Clamshell ARC crate DEPP ARC Controller Module Clamshell LED Controller L3 Testing Meeting March 7, 2003 UCSB Status-Anthony Affolder
4
UCSB Status-Anthony Affolder
ARC Test Results (1) Raw Noise 1 Prototype Module Tested Module testing in UCSB clamshell decreases common-mode noise to the point where sensor-sensor opens become detectable by their lower noise levels Zoom in Sensor-Sensor Open Visible L3 Testing Meeting March 7, 2003 UCSB Status-Anthony Affolder
5
UCSB Status-Anthony Affolder
ARC Test Results (2) 5 hybrids tested on arrival All good, but fail current requirement given in the Procedures for Module Testing Pedestal test reproducible, but noise measured very sensitive to digitization effects Measured noise varying the pedestal by changing VPSP value Digitization effects cause variations larger than ±20% See hep.ucsb.edu/cms/cmsUCSB.html for more complete description L3 Testing Meeting March 7, 2003 UCSB Status-Anthony Affolder
6
UCSB Status-Anthony Affolder
ARC Test Results (3) 4 hybrids have had APV bonded to pitch adapters All channels are good Hybrid clamshells enable testing without large pickup effects at chip edges Hybrid isolated with plate and lid grounded Same requirements can be made for hybrids with or w/o PA bonded L3 Testing Meeting March 7, 2003 UCSB Status-Anthony Affolder
7
ARC Test X-calibrations
Minimal X-calibration has been performed Same faulty channels found at FNAL/UCSB on prototype model CERN FHIT/UCSB ARC test compared Pedestals very similar Noise is slightly higher than CERN FHIT measurement Not understood if it is FHIT/ARC difference, a software difference, an environmental difference, or a digitization effect Once model production begins, plan to exchange modules with FNAL for X-calibration L3 Testing Meeting March 7, 2003 UCSB Status-Anthony Affolder
8
UCSB Status-Anthony Affolder
ARCS Database No entries yet put into official database Waiting for ARCS interface for database upload All testing results have been made available to silicon community on local website hep.ucsb.edu/people/affolder/module_test_UCSB.html L3 Testing Meeting March 7, 2003 UCSB Status-Anthony Affolder
9
UCSB Status-Anthony Affolder
DAQ status 1 full DAQ stand available at UCSB Planned only for Vienna box tests with modules Limited number of tests performed Focus on bringing up hardware/software for Vienna box Xdaq, LT, and Xrod software all compiled and run Still working to understand controls/output No LED stand planned for DAQ No database work done as of yet L3 Testing Meeting March 7, 2003 UCSB Status-Anthony Affolder
10
UCSB Status-Anthony Affolder
Vienna Box Status Vienna Box recently arrived at UCSB No modification necessary to use with TOB module carrier plates Full compliment of plates currently in machine shop LV distribution ready Just received HV controllers (both the A128HS and A1303) Integrating as fast as possible Demonstrated each slot works with hybrids Thermal cycled box between –25 to 30° C with chiller Need hardware to test more than one channel at a time L3 Testing Meeting March 7, 2003 UCSB Status-Anthony Affolder
11
UCSB Status-Anthony Affolder
Needed Hardware Torino Interlock Box 3 Electrometers 2 in-route Flat cable-Lemo adapter Under construction at UCSB DAQ components 8 VUTRI 10 in-route 9 PAACB 6 in-route 9 hybrid-to-utri ver. D 1 in-route 1 TPO 1 CCU 2 PAACB to TPO interface Needed for backplane pulsing L3 Testing Meeting March 7, 2003 UCSB Status-Anthony Affolder