Presentation is loading. Please wait.

Presentation is loading. Please wait.

HAWC Update 5/12/16 Ben Tamagne.

Similar presentations


Presentation on theme: "HAWC Update 5/12/16 Ben Tamagne."— Presentation transcript:

1 HAWC Update 5/12/16 Ben Tamagne

2 Progress Analysis of Jesse’s variables in bins 3-7
Data analyzed assumed fiducial cut His variables tended to do worse at higher energies Currently improving code. To come: Easily modifiable to accept arbitrary cut specifications Analyzes all fHit bins per run of the program (each run with selectable variable)

3 Summary

4 Summary Extremely low signal efficiency example

5 Summary Q vs. Signal Efficiency

6 Summary

7 Summary

8 Summary

9 All plots available at: https://hep. pa. msu
All plots available at: Within fHit_Bin_Analysis_of_Jesses_Variables.zip Or available by at request


Download ppt "HAWC Update 5/12/16 Ben Tamagne."

Similar presentations


Ads by Google