Download presentation
Presentation is loading. Please wait.
1
Community Meeting #2 May 2, 2018
2
Talking Points: Why we are here
3
HASENSTAB ARCHITECTS TEAM REPRESENTATIVES
Dennis Check AIA Greg Chaplin AIA, NCARB Ben Rantilla AIA, NCARB
4
Recap Greg Lead
5
Recap 1 OFCC Co-Funded PreK-12 with LFI Additions 2
165,000 Square Feet New Bldg. Co-Funded 3 LFI = Athletics, Admin. Offices, Auditorium 4 Co-Funded and LFI will be single Ballot Item 5 Why Build LFI Now?
6
Co-funded Building Location
Greg Lead
7
Building Location Possibilities
13
South
14
East
15
LFI (Locally Funded Initiative)
Greg Lead
16
Meetings with Constituent Groups
Administration Performing Arts Curriculum Athletics
17
Administration Offices
1 Office Space for School Board 2 Built within PreK-12 (Additional Square Feet) 3 Share Common Functions
18
Community Auditorium (Performing Arts)
1 500 Seats 2 Built within PreK-12 3 Multi-Use 4 “Offering of New Opportunities”
19
Community Auditorium (Performing Arts)
Plays / Dramatic Performances Assemblies 5-6th Orientation Senior Awards 8-9th Orientation Board Meetings 8th grade recognition Financial Aid Night Presentations 5th grade awards assembly Freshmen Orientation Concerts ACT Testing Collaborative space Opening Convocation Wax Museum Trustee Meetings Economics Day Lions Club Talent Show Historical Society Jr/Seniors College Presentations Youth Banquets Awards banquet Signing Day for Athletics Bingo Career Day NHS induction Theater class Parent Education Drama Club - Movie premiere CCP Night
20
Separation of Elementary & MS/HS
Curriculum 1 Basic Building Layout 2 21st Century Learning 3 Separation of Elementary & MS/HS 4 Shared Facilities
21
Baseball and Softball Improvements
Athletics 1 Field House (Weight room, toilets for stadium and teams, concessions, team lockers) 2 Track 3 Artificial Turf Field 4 Baseball and Softball Improvements
22
LFI (Locally Funded Initiative)
LFI is a combination of Athletics, Administration and Auditorium (AAA) elements that we just described Greg Lead
23
LFI Option One Keep Portion of High School 1 Track/Field/Misc 2
Field House 3 Retain/Renovate Portion of the High School 4 Administrative Offices in new PreK-12 5 Community Auditorium in new PreK-12
24
LFI Option One Keep Portion of High School
25
LFI Option One Keep Portion of High School
26
LFI Option One Keep Portion of High School
27
LFI Option One Keep Portion of High School
28
LFI Option One Keep Portion of High School
29
Administration Offices
LFI Option Two All New 1 Field House 2 Track/Field/Misc 3 Administration Offices 4 Auditorium
30
LFI Option Two All New
31
LFI Option Two All New
32
LFI Option Two All New
33
LFI Option Two All New
34
LFI Option Two All New
35
Keep Portion of Existing High School Demo All Existing Facilities
Recap LFI Option 1 Keep Portion of Existing High School LFI Option 2 Demo All Existing Facilities Some minor variations within these schemes are possible and will be solidified as we continue with preliminary design
36
Questions Greg Lead
37
THANK YOU!
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.