Presentation is loading. Please wait.

Presentation is loading. Please wait.

Adjustments required for program or funding changes Options

Similar presentations


Presentation on theme: "Adjustments required for program or funding changes Options"— Presentation transcript:

1 Adjustments required for program or funding changes Options
Acquisition Sustainment B C Operations & Support Technology Maturation and Risk Reduction Engineering and Manufacturing Development Production & Deployment FRP FOC Materiel Solution Analysis Post IOC Reviews A Fielding plans adjusted Metrics tracked & adjustment plans established LCSP Focus Sustaining Engineering processes for refining product support package elements Logistics assessments on how the system and supply chain are performing Adjustments required for program or funding changes Options


Download ppt "Adjustments required for program or funding changes Options"

Similar presentations


Ads by Google