Download presentation
Presentation is loading. Please wait.
1
PAM Station Photo: HVAMS03
Lightning Spike 10-m Tower: Prop-Vane Anemometer 915Mhz Transciever Antenna Static Pressure Port 2-m Temperature / Humidity in aspirated shield Solar Panel / battery Power System Tipping Bucket Rain Gauge Radiometer Stand: GOES Antenna Electronics Box
2
Instruments Wind speed / Direction 10m Temperature / Humidity 10m
Pressure m Rain Longwave / shortwave radiation incoming
3
Schedule Sept – testing platform in Boulder
Sept / Oct – Ship via SPOL seatainers Nov – setup 4 to 6 days Nov – Jan operations
4
Issues Communication: Anchoring 10 meter tower
Line of site, RF 915 Mhz GOES satellite Anchoring 10 meter tower Sand bag or anchor into stone
5
Operations 24 hour 5 minute averages 10-Second Console data output
Service provided by GLASS operator Minimum service required Full compliment of spare electronics
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.