Download presentation
Presentation is loading. Please wait.
1
P802.15.3b Status Sponsor balloting completed:
Initial ballot: 3Aug05-2Sept05 92 affirmative, 3 negative, 5 abstain 84% return, 97% approval Recirculation ballot: 17Oct05-27Oct05 96 affirmative, 0 negative, 7 abstain One negative without comments entered in error 87% return, 100% approval Editorial Comments will be given to IEEE-SA with P D04-Draft-Amendment.pdf On REVCOM agenda for December 2005
2
P802.15.3b Recirculation Comment Resolution
Affirmative voter submitted two non-binding comments (one general, one technical) that were subsequently withdrawn by the voter. SCC14 and MyBallot Editorial review comments: SCC14 - no problems MyBallot Editorial - clarified purpose of D1 Annex D1 Annex to be placed between current Annex D and Annex E causing Annex E to be updated to be Annex F.
3
802.15 Working Group Approval
Motion: That WG recommends that P D04-Draft-Amendment.pdf be forwarded to RevCom. Moved: John Barr Second: Jim Allen Vote: 30/0/2
4
Motion to the EC Move that P D04-Draft-Amendment be forwarded to RevCom Mover: Bob Heile Seconder: Carl Stevenson
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.