Download presentation
Presentation is loading. Please wait.
1
South Dakota School of Mines & Technology Data Analysis Industrial Engineering
2
Data Analysis Box Plots Industrial Engineering
3
Box Plots Problem with empirical is we may simply not have enough data
For small data sets, analysts often like to provide a rough graphical measure of how data is dispersed Consider our student data 2.4, 2.7, 2.8, 2.9, 3.0, 3.0, 3.1, 3.3, 3.5, 3.9
4
Box Plots Ranked student Gpa data
2.4, 2.7, 2.8, 2.9, 3.0, 3.0, 3.1, 3.3, 3.5, 3.9 Min = 2.4 Max = 3.9 2.4 3.9
5
Box Plots Ranked student Gpa data
2.4, 2.7, 2.8, 2.9, 3.0, 3.0, 3.1, 3.3, 3.5, 3.9 Median = ( )/2 = 3.0 2.4 3.9 3.0
6
Box Plots Ranked student Gpa data
2.4, 2.7, 2.8, 2.9, 3.0, 3.0, 3.1, 3.3, 3.5, 3.9 Median Bottom= ( )/2 = 2.75 2.4 3.9 3.0 2.75
7
Box Plots Ranked student Gpa data
2.4, 2.7, 2.8, 2.9, 3.0, 3.0, 3.1, 3.3, 3.5, 3.9 Median Top = ( )/2 = 3.4 2.4 3.9 3.0 2.75 3.4
8
Box Plots Ranked student Gpa data
2.4, 2.7, 2.8, 2.9, 3.0, 3.0, 3.1, 3.3, 3.5, 3.9 2.4 3.9 3.0 2.75 3.4
9
Fail Time Data Lower Quartile = 6.1 Min = 0.5 Median = 14.3 Max = 73.8
Upper Quartile = 26.7 Min = 0.5 Max = 73.8
10
Class Problem The following data represents sorted observations on deviations from desired diameters of ball bearings. Compute a box plot.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.